Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes headworks improvements - mechanical construction. The replacement of the existing raw sewage pumps in the WWTP pump station with new pumps pipe, fittings, valves and flow meters and all appurtenances thereto. Concrete repairs in the influent channel pipe tunnel. The replacement of the existing HVAC equipment in the Grit Building with new louvers, dampers, fans and ventilators. Replacement of the interior CISP roof drainpipe with PVC pipe in the existing grit building. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide construction of wastewater treatment plant office.
Posted Date
Nov 16, 2025
Due Date
Jan 14, 2026
Release: Nov 16, 2025
Close: Jan 14, 2026
Provide construction of wastewater treatment plant office.
AvailableProcurement and installation of a new UV Disinfection System, preferably TrojanUVSigna™ 3000 or equivalent, at the Harold G. Thompson Wastewater Treatment Plant.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Procurement and installation of a new UV Disinfection System, preferably TrojanUVSigna™ 3000 or equivalent, at the Harold G. Thompson Wastewater Treatment Plant.
AvailableThe project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis