Lower Yellowstone Irrigation District 1
The proposed project is classified as a design and construction project for rehabilitation of the existing pump station. The rehabilitation efforts will include replacement of the deteriorated middle pump and include the installation of a remote control and monitoring system. The project intends to replace the remaining original pump, motor and electrical switchgear.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Gulf Coast Water Authority
Provide shannon pumping plant project.
Posted Date
Sep 18, 2025
Due Date
Nov 19, 2025
Release: Sep 18, 2025
Gulf Coast Water Authority
Close: Nov 19, 2025
Provide shannon pumping plant project.
AvailableCounty of Napa
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
County of Napa
Close: Dec 18, 2025
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
AvailableBorough of West Chester
Remove, dispose of off-site and replace three (3) pieces of existing major equipment at theWastewater Treatment Plant's substation, by installing the same equipment supplied by the Borough: 1. One (1) 2,000 kva transformer; 2. One (1) 35,000 v switchgear; 3. One (1) walk-in low voltage switchgear. Furnish and install a new Automatic Transfer Switch (ATS) at GCWWTP's Control Building (B-1). Furnish and install all conduits, cabling, splices, grounding, connections, anchors; supports (structural and nonstructural, wherever needed); rigging; surface preparation and touchup painting (wherever needed); appurtenant equipment and devices, testing and restoration.
Posted Date
Oct 24, 2025
Due Date
Nov 21, 2025
Release: Oct 24, 2025
Borough of West Chester
Close: Nov 21, 2025
Remove, dispose of off-site and replace three (3) pieces of existing major equipment at theWastewater Treatment Plant's substation, by installing the same equipment supplied by the Borough: 1. One (1) 2,000 kva transformer; 2. One (1) 35,000 v switchgear; 3. One (1) walk-in low voltage switchgear. Furnish and install a new Automatic Transfer Switch (ATS) at GCWWTP's Control Building (B-1). Furnish and install all conduits, cabling, splices, grounding, connections, anchors; supports (structural and nonstructural, wherever needed); rigging; surface preparation and touchup painting (wherever needed); appurtenant equipment and devices, testing and restoration.
AvailableBase Portsmouth (00027)
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
Posted Date
Nov 7, 2025
Due Date
Nov 28, 2025
Release: Nov 7, 2025
Base Portsmouth (00027)
Close: Nov 28, 2025
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis