Borough of West Chester
Remove, dispose of off-site and replace three (3) pieces of existing major equipment at theWastewater Treatment Plant's substation, by installing the same equipment supplied by the Borough: 1. One (1) 2,000 kva transformer; 2. One (1) 35,000 v switchgear; 3. One (1) walk-in low voltage switchgear. Furnish and install a new Automatic Transfer Switch (ATS) at GCWWTP's Control Building (B-1). Furnish and install all conduits, cabling, splices, grounding, connections, anchors; supports (structural and nonstructural, wherever needed); rigging; surface preparation and touchup painting (wherever needed); appurtenant equipment and devices, testing and restoration.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
County of Napa
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
County of Napa
Close: Dec 18, 2025
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
AvailableCity of Waycross
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
Posted Date
Sep 26, 2025
Due Date
Dec 5, 2025
Release: Sep 26, 2025
City of Waycross
Close: Dec 5, 2025
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
Chesterfield County
Purchase and delivery of a floating aerator, model dbs ma-15 or equal for falling creek wastewater treatment plant.
Posted Date
Nov 13, 2025
Due Date
Nov 20, 2025
Release: Nov 13, 2025
Chesterfield County
Close: Nov 20, 2025
Purchase and delivery of a floating aerator, model dbs ma-15 or equal for falling creek wastewater treatment plant.
AvailableDefiance County
The project includes the construction of a 15,000 GPD precast packaged wastewater treatment plant. It also includes the construction of a pole building over the wastewater treatment plant, ventilation, electrical work, piping and sitwork. The existing wastewater treatment plant and buiilding shall be demolished after the new plant is operational.
Posted Date
Nov 2, 2025
Due Date
Dec 2, 2025
Release: Nov 2, 2025
Defiance County
Close: Dec 2, 2025
The project includes the construction of a 15,000 GPD precast packaged wastewater treatment plant. It also includes the construction of a pole building over the wastewater treatment plant, ventilation, electrical work, piping and sitwork. The existing wastewater treatment plant and buiilding shall be demolished after the new plant is operational.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis