Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Napa
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Borough of West Chester
Remove, dispose of off-site and replace three (3) pieces of existing major equipment at theWastewater Treatment Plant's substation, by installing the same equipment supplied by the Borough: 1. One (1) 2,000 kva transformer; 2. One (1) 35,000 v switchgear; 3. One (1) walk-in low voltage switchgear. Furnish and install a new Automatic Transfer Switch (ATS) at GCWWTP's Control Building (B-1). Furnish and install all conduits, cabling, splices, grounding, connections, anchors; supports (structural and nonstructural, wherever needed); rigging; surface preparation and touchup painting (wherever needed); appurtenant equipment and devices, testing and restoration.
Posted Date
Oct 24, 2025
Due Date
Nov 21, 2025
Release: Oct 24, 2025
Borough of West Chester
Close: Nov 21, 2025
Remove, dispose of off-site and replace three (3) pieces of existing major equipment at theWastewater Treatment Plant's substation, by installing the same equipment supplied by the Borough: 1. One (1) 2,000 kva transformer; 2. One (1) 35,000 v switchgear; 3. One (1) walk-in low voltage switchgear. Furnish and install a new Automatic Transfer Switch (ATS) at GCWWTP's Control Building (B-1). Furnish and install all conduits, cabling, splices, grounding, connections, anchors; supports (structural and nonstructural, wherever needed); rigging; surface preparation and touchup painting (wherever needed); appurtenant equipment and devices, testing and restoration.
AvailableOswego County
Construction of the Asset Renewal Project Phase 2, Baldwinsville-Seneca Knolls Wastewater Treatment Plant Contract No. 2A - General Construction, Contract No. 2B Electrical Construction, and Contract No. 2C Heating and Ventilating Construction. The project generally consists of: Process Drain and Influent Sampler Relocation Primary Sludge Degritter Replacement RAS and WAS Flow Metering Upgrades Replacement of Aeration Purge Blowers Replacement of Belt Filter Presses and Upgrades to Sludge Loadout Replacement of Process Water Pumps Slide Gate Replacements throughout the WWTP SCADA Upgrades throughout WWTP HVAC and Electrical Updates throughout WWTP Miscellaneous Concrete and Structural Repairs throughout WWTP Architectural Update to WWTP Building Site/Civil Improvements through WWTP.
Posted Date
Oct 23, 2025
Due Date
Dec 11, 2025
Release: Oct 23, 2025
Oswego County
Close: Dec 11, 2025
Construction of the Asset Renewal Project Phase 2, Baldwinsville-Seneca Knolls Wastewater Treatment Plant Contract No. 2A - General Construction, Contract No. 2B Electrical Construction, and Contract No. 2C Heating and Ventilating Construction. The project generally consists of: Process Drain and Influent Sampler Relocation Primary Sludge Degritter Replacement RAS and WAS Flow Metering Upgrades Replacement of Aeration Purge Blowers Replacement of Belt Filter Presses and Upgrades to Sludge Loadout Replacement of Process Water Pumps Slide Gate Replacements throughout the WWTP SCADA Upgrades throughout WWTP HVAC and Electrical Updates throughout WWTP Miscellaneous Concrete and Structural Repairs throughout WWTP Architectural Update to WWTP Building Site/Civil Improvements through WWTP.
AvailableBase Portsmouth (00027)
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
Posted Date
Nov 7, 2025
Due Date
Nov 28, 2025
Release: Nov 7, 2025
Base Portsmouth (00027)
Close: Nov 28, 2025
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
AvailableCity of Hutto
The City of Hutto is soliciting competitive sealed proposals for the Brushy Creek Wastewater Interceptor Phase 4 Project to construct approximately 16,300 linear feet of 48-inch and 42-inch wastewater interceptor and decommission the Enclave at Brushy Creek Lift Station. The project supports continued growth in Hutto by providing upgraded interceptor capacity and requires proposal security equal to 5% of the proposer’s total proposal amount.
Posted Date
-
Due Date
Dec 17, 2025
City of Hutto
Close: Dec 17, 2025
The City of Hutto is soliciting competitive sealed proposals for the Brushy Creek Wastewater Interceptor Phase 4 Project to construct approximately 16,300 linear feet of 48-inch and 42-inch wastewater interceptor and decommission the Enclave at Brushy Creek Lift Station. The project supports continued growth in Hutto by providing upgraded interceptor capacity and requires proposal security equal to 5% of the proposer’s total proposal amount.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis