Summary
Work shall be completed under one (1) Contract: Contract No. 1 - General Construction. The Work for this Contract is generally described as follows: Contract No. 1 - General Construction: Work generally consists of: 1) modifications to the WTP powdered activated carbon (PAC) system which includes installing a new PAC bag unloader system, modifications to the roof structure to increase its height, installing a new roof membrane and insulation, removal and retrofit of the existing PAC piping and components, mechanical modifications, electrical modifications, and other associated appurtenances; and 2) modifications to the existing raw water intake pump station which include replacing two existing raw water intake pumps, modifications to the raw water pump station roof and hatches, asbestos removal and abatement, installation of a 10’ x 16’ prefabricated electrical building with base slab and helical piers, new and retrofitted electrical gear and components, mechanical modifications, process piping, site grading, and associated appurtenances.