Summary
Replacement of approx. 3,170 SF (0.6 mi) in length, of sidewalks. This Pedestrian Improvement project will construct widened sidewalks, and new sidewalks in areas where sidewalks did not previously exist, providing safe and ADA-compliant walking surfaces. The project also includes three intersection tables for safer pedestrian crossings, replacement of existing driveway aprons and ADA curb ramps. The principal items of work consist of but are not limited to the following items: Excavation, Unclassified; Tree removal; Hot Mix Asphalt; Pervious Concrete Sidewalk; Perforated PVC Pipe Underdrain; Stormwater Inlets; Concrete Vertical Curb; Dry-laid Fieldstone Retaining Wall; and a Pedestrian Signal.