Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of eleven (11) timber bridges in Haywood and Lauderdale counties, Tennessee.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 15, 2026
Release: Dec 2, 2024
Close: Jan 15, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableDESIGN-BUILD services for Bridge Group 16D Route 6 Johnston. The proposals would include completely replacing three (3) bridges (Bridge Nos. 060701, 060801, and 060901) along the US Route 6 corridor; realigning the US Route 6 westbound off-ramp to US Route 6A westbound to improve intersection geometry and safety.
Posted Date
Nov 26, 2025
Due Date
Mar 9, 2026
Release: Nov 26, 2025
Close: Mar 9, 2026
DESIGN-BUILD services for Bridge Group 16D Route 6 Johnston. The proposals would include completely replacing three (3) bridges (Bridge Nos. 060701, 060801, and 060901) along the US Route 6 corridor; realigning the US Route 6 westbound off-ramp to US Route 6A westbound to improve intersection geometry and safety.
AvailableBridge design-build project.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Bridge design-build project.
AvailableDESIGN/BUILD: Design, engineering, fabrication, delivery, and construction of two (2) custom-built 28' x 48' timber frame pavilions.
Posted Date
Dec 22, 2025
Due Date
Jan 14, 2026
Release: Dec 22, 2025
Close: Jan 14, 2026
DESIGN/BUILD: Design, engineering, fabrication, delivery, and construction of two (2) custom-built 28' x 48' timber frame pavilions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis