Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fayetteville State University
Construction of the telecommunications building HVAC upgrade. Work includes removing three DX units, installing three air handler units and connecting to the campus chilled water system. Installation of VAVs and hot water piping. Installation of ductwork and new diffusers Replace main entrance electrical gear and panels.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Illinois Capital Development Board
Upgrade HVAC and building envelope.
Posted Date
-
Due Date
Nov 25, 2025
Release: -
Illinois Capital Development Board
Close: Nov 25, 2025
Upgrade HVAC and building envelope.
AvailableStony Brook Regional Sewer Authority
The work includes comprehensive upgrades to the existing heating, ventilation, and air conditioning (HVAC) systems serving approximately 23,000 square feet of office, laboratory, and process areas in the Operations Building. The project involves the removal and replacement of multiple large-capacity air-handling units, installation of new variable air volume (VAV) terminal units, exhaust fans, ductwork, process and chilled-water piping, and a replacement of the existing control system with a direct digital control (DDC) system fully integrated with the facility's building management system. Work also includes new electrical power distribution and control wiring, fireproofing and insulation, and architectural restoration of all impacted areas.
Posted Date
Oct 28, 2025
Due Date
Dec 9, 2025
Release: Oct 28, 2025
Stony Brook Regional Sewer Authority
Close: Dec 9, 2025
The work includes comprehensive upgrades to the existing heating, ventilation, and air conditioning (HVAC) systems serving approximately 23,000 square feet of office, laboratory, and process areas in the Operations Building. The project involves the removal and replacement of multiple large-capacity air-handling units, installation of new variable air volume (VAV) terminal units, exhaust fans, ductwork, process and chilled-water piping, and a replacement of the existing control system with a direct digital control (DDC) system fully integrated with the facility's building management system. Work also includes new electrical power distribution and control wiring, fireproofing and insulation, and architectural restoration of all impacted areas.
AvailableOregon Department of Transportation
Work consists of Motor Pool Heating, Ventilation, and Air Conditioning (“HVAC”) and Roof Upgrade project. The Work, includes, but is not limited to: Removal of existing roof on main building; Installation of new roof on main building; Extend main building parapet, clad with metal panel; Install new skylight; Replace damaged interior ceiling tile with new ceiling tile; Supply new door; Supply rooftop safety equipment; Replacement of entire HVAC building control system with the Schneider Electric EcoStruxture.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Oregon Department of Transportation
Close: Dec 18, 2025
Work consists of Motor Pool Heating, Ventilation, and Air Conditioning (“HVAC”) and Roof Upgrade project. The Work, includes, but is not limited to: Removal of existing roof on main building; Installation of new roof on main building; Extend main building parapet, clad with metal panel; Install new skylight; Replace damaged interior ceiling tile with new ceiling tile; Supply new door; Supply rooftop safety equipment; Replacement of entire HVAC building control system with the Schneider Electric EcoStruxture.
AvailableCalifornia Department of Parks and Recreation
Upgrade the heating, ventilation, and air conditioning (hvac) control systems. The project shall include the installation and integration of new digital controllers across rooftop units, a dehumidification unit, and exhaust fans, as well as the setup of network infrastructure and a centralized operator interface.
Posted Date
Oct 31, 2025
Due Date
Dec 9, 2025
Release: Oct 31, 2025
California Department of Parks and Recreation
Close: Dec 9, 2025
Upgrade the heating, ventilation, and air conditioning (hvac) control systems. The project shall include the installation and integration of new digital controllers across rooftop units, a dehumidification unit, and exhaust fans, as well as the setup of network infrastructure and a centralized operator interface.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis