Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
For building 7, elevator 2 controller replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This solicitation requests modernization of one geared traction passenger elevator in the Solids Handling Building, including a new controller, door operator, signal fixtures, wiring, AC motor, rope brake, and reconditioning of governor and machine; it includes related electrical, fire life safety, and HVAC work. The estimated construction cost is $630,000 and the contract term/project duration is 365 consecutive calendar days. A mandatory pre-bid conference is scheduled for 2026-01-13 at 10:00 AM PST at 1301 Andersen Dr., San Rafael, CA and bids are due 2026-01-29.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
Premium
Access the largest public sector contact database
This solicitation requests modernization of one geared traction passenger elevator in the Solids Handling Building, including a new controller, door operator, signal fixtures, wiring, AC motor, rope brake, and reconditioning of governor and machine; it includes related electrical, fire life safety, and HVAC work. The estimated construction cost is $630,000 and the contract term/project duration is 365 consecutive calendar days. A mandatory pre-bid conference is scheduled for 2026-01-13 at 10:00 AM PST at 1301 Andersen Dr., San Rafael, CA and bids are due 2026-01-29.
AvailableReplacement of cooling towers number 1 and 2 at the central plant (building 11).
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Replacement of cooling towers number 1 and 2 at the central plant (building 11).
AvailableThe City of Miami Beach seeks qualified elevator contractors to join a prequalification pool for elevator replacement and modernization services, including removal, disposal, and installation to meet current building codes and ADA requirements. Inclusion in the pool is a prerequisite to receive invitations to quote and be considered for project work over the stated term.
Posted Date
Jul 22, 2025
Due Date
Jun 24, 2030
Release: Jul 22, 2025
Close: Jun 24, 2030
The City of Miami Beach seeks qualified elevator contractors to join a prequalification pool for elevator replacement and modernization services, including removal, disposal, and installation to meet current building codes and ADA requirements. Inclusion in the pool is a prerequisite to receive invitations to quote and be considered for project work over the stated term.
AvailableThe project consists of a replacement of the fire pump controller in the basement of the UAB Spain Wallace facility. The scope of work includes electrical demolition and new work, as well as associated architectural and mechanical modifications as required to facilitate the equipment replacement.
Posted Date
Dec 3, 2025
Due Date
Jan 22, 2026
Release: Dec 3, 2025
Close: Jan 22, 2026
The project consists of a replacement of the fire pump controller in the basement of the UAB Spain Wallace facility. The scope of work includes electrical demolition and new work, as well as associated architectural and mechanical modifications as required to facilitate the equipment replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis