Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Tar and chipping of approx. 3 mi. of roadway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Tar Lake Superfund (SF). Provide construction services for environmental remedial excavation, biosparge system installation, and environmental remedial monitoring. The work includes developing an EPA-approved Quality Assurance Project Plan, mobilizing to the project site, excavating approximately 215,000 tons of contaminated soil with temporary shoring, backfilling with clean imported soils, installing 28 new biosparge wells, and an approximately 160 square foot pre-engineered structure to house the compressors. Ancillary activities include abandoning existing groundwater monitoring wells, installing new groundwater monitoring wells, installing erosion control measures, conducting a utility survey to locate existing biosparge system piping, confirmation soil sampling, and site restoration.
Posted Date
Jan 13, 2026
Due Date
Jan 28, 2026
Release: Jan 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 28, 2026
Provide Tar Lake Superfund (SF). Provide construction services for environmental remedial excavation, biosparge system installation, and environmental remedial monitoring. The work includes developing an EPA-approved Quality Assurance Project Plan, mobilizing to the project site, excavating approximately 215,000 tons of contaminated soil with temporary shoring, backfilling with clean imported soils, installing 28 new biosparge wells, and an approximately 160 square foot pre-engineered structure to house the compressors. Ancillary activities include abandoning existing groundwater monitoring wells, installing new groundwater monitoring wells, installing erosion control measures, conducting a utility survey to locate existing biosparge system piping, confirmation soil sampling, and site restoration.
AvailableProcurement of nature-based, natural infrastructure projects to address chronic flooding in the Cape Fear, French Broad, Lumber, Neuse, Tar-Pamlico, and White Oak River Basins.
Posted Date
Oct 15, 2025
Due Date
Mar 10, 2026
Release: Oct 15, 2025
Close: Mar 10, 2026
Procurement of nature-based, natural infrastructure projects to address chronic flooding in the Cape Fear, French Broad, Lumber, Neuse, Tar-Pamlico, and White Oak River Basins.
AvailableTree and brush removal, tree trimming, side trimming, cutting and chipping, mowing, disposal of waste and debris, and application of herbicides, and all other requirements.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
Tree and brush removal, tree trimming, side trimming, cutting and chipping, mowing, disposal of waste and debris, and application of herbicides, and all other requirements.
AvailablePerform thinning, pruning, skirting, removal of trees/shrubs/vines, chipping, removal/grinding of stumps adjacent to energized power lines and any associated non-energized lines; clean up, and proper disposal of all debris generated by the tree trimming operations including palm trees and palm debris.
Posted Date
Nov 26, 2025
Due Date
Dec 24, 2026
Release: Nov 26, 2025
Close: Dec 24, 2026
Perform thinning, pruning, skirting, removal of trees/shrubs/vines, chipping, removal/grinding of stumps adjacent to energized power lines and any associated non-energized lines; clean up, and proper disposal of all debris generated by the tree trimming operations including palm trees and palm debris.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →