Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Alabama Department of Transportation
Work includes constructing the Roadway Improvements (Changing Directional Traffic Flow and Turn Radius Improvements) on SR-53 (US-231 and US-411)/Courthouse Square and SR-25 (US-411) in Ashville. Length 0.321 mi.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Alabama Department of Transportation
Work includes constructing the Intersection Improvements (Northbound Thru Lane and Westbound Turn Lane Additions) on SR-13 (US-43) at Rose Boulevard/Mitt Lary Road in Northport. Length 0.256 mi.
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Intersection Improvements (Northbound Thru Lane and Westbound Turn Lane Additions) on SR-13 (US-43) at Rose Boulevard/Mitt Lary Road in Northport. Length 0.256 mi.
AvailableAlabama Department of Transportation
Work includes constructing the Intersection Improvements (Grading, Drainage, Pavement, and Traffic Stripe) on SR-12 (US-84) at Broadway Street in Ashford. Length 0.254 mi.
Posted Date
-
Due Date
Dec 5, 2025
Release: -
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Intersection Improvements (Grading, Drainage, Pavement, and Traffic Stripe) on SR-12 (US-84) at Broadway Street in Ashford. Length 0.254 mi.
AvailableCity of Cleveland
Work will consist of removing and replacing asphalt wearing course and intermediate course, installing new curbs, walks, and driveway aprons as needed, PROWAG/ADA-compliant curb ramps and landings, roadway drainage, castings adjusted to grade, traffic control improvements including new mast arm signals.
Posted Date
Nov 5, 2025
Due Date
Dec 5, 2025
Release: Nov 5, 2025
City of Cleveland
Close: Dec 5, 2025
Work will consist of removing and replacing asphalt wearing course and intermediate course, installing new curbs, walks, and driveway aprons as needed, PROWAG/ADA-compliant curb ramps and landings, roadway drainage, castings adjusted to grade, traffic control improvements including new mast arm signals.
AvailableSt. Clair County Road Commission
Furnishing 2026 requirements of the following materials and services: Crack Sealant; 2. Bituminous Materials - Plant Mix; 2a. Bituminous Materials – Cold Patch; 3a. Limestone Aggregates - Private Dock; 4. Corrugated Metal Pipe; 6. Signs, Blanks and Sheeting; 8. Steel Beam Guardrail; 9. Scraper Blades and Cutting Tips; 11. Diesel and Gasoline; 13. Natural Aggregate; SERVICES; B. Limestone Haul; F. Contractor Equipment Rental Services with and without operator,; our job site; G. Catch Basin Cleaning and Pipe Jetting; P. Phragmites and Intersection Spraying; S. Mowing on I-94, the Lapeer Connector and BL-69.
Posted Date
Nov 5, 2025
Due Date
Jan 13, 2026
Release: Nov 5, 2025
St. Clair County Road Commission
Close: Jan 13, 2026
Furnishing 2026 requirements of the following materials and services: Crack Sealant; 2. Bituminous Materials - Plant Mix; 2a. Bituminous Materials – Cold Patch; 3a. Limestone Aggregates - Private Dock; 4. Corrugated Metal Pipe; 6. Signs, Blanks and Sheeting; 8. Steel Beam Guardrail; 9. Scraper Blades and Cutting Tips; 11. Diesel and Gasoline; 13. Natural Aggregate; SERVICES; B. Limestone Haul; F. Contractor Equipment Rental Services with and without operator,; our job site; G. Catch Basin Cleaning and Pipe Jetting; P. Phragmites and Intersection Spraying; S. Mowing on I-94, the Lapeer Connector and BL-69.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis