Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Alabama Department of Transportation
Work includes constructing the Intersection Improvements (Grading, Drainage, Pavement, and Traffic Stripe) on SR-12 (US-84) at Broadway Street in Ashford. Length 0.254 mi.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Alabama Department of Transportation
Work includes approx.110 LF of Removing Guardrail, 59 CUYD of Borrow Excavation (Loose Truckbed Measurement)(A4 or Better) , 168 LF of 22" Span, 14" Rise Roadway Pipe (Class 3 R.C.) ,4,022 SQFT of Temporary Traffic Control Markings .
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes approx.110 LF of Removing Guardrail, 59 CUYD of Borrow Excavation (Loose Truckbed Measurement)(A4 or Better) , 168 LF of 22" Span, 14" Rise Roadway Pipe (Class 3 R.C.) ,4,022 SQFT of Temporary Traffic Control Markings .
AvailableAlabama Department of Transportation
Work includes constructing the Roadway Improvements (Changing Directional Traffic Flow and Turn Radius Improvements) on SR-53 (US-231 and US-411)/Courthouse Square and SR-25 (US-411) in Ashville. Length 0.321 mi.
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Roadway Improvements (Changing Directional Traffic Flow and Turn Radius Improvements) on SR-53 (US-231 and US-411)/Courthouse Square and SR-25 (US-411) in Ashville. Length 0.321 mi.
AvailableAlabama Department of Transportation
Work includes constructing the Intersection Improvements (Northbound Thru Lane and Westbound Turn Lane Additions) on SR-13 (US-43) at Rose Boulevard/Mitt Lary Road in Northport. Length 0.256 mi.
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Intersection Improvements (Northbound Thru Lane and Westbound Turn Lane Additions) on SR-13 (US-43) at Rose Boulevard/Mitt Lary Road in Northport. Length 0.256 mi.
AvailableVirginia Department of Transportation
Work includes 1 LS of clearing and grubbing; 56 LF of 18" jacked and bored pipe; 197 LF of 18" concrete pipe; 782 LF of 18" storm sewer pipe; 67 LF of 3/4" water service line; 492 LF of 6" DI water main; see attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Virginia Department of Transportation
Close: Dec 17, 2025
Work includes 1 LS of clearing and grubbing; 56 LF of 18" jacked and bored pipe; 197 LF of 18" concrete pipe; 782 LF of 18" storm sewer pipe; 67 LF of 3/4" water service line; 492 LF of 6" DI water main; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis