Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Alabama Department of Transportation
Work includes constructing the Intersection Improvements (Northbound Thru Lane and Westbound Turn Lane Additions) on SR-13 (US-43) at Rose Boulevard/Mitt Lary Road in Northport. Length 0.256 mi.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Alabama Department of Transportation
Work includes constructing the Roadway Improvements (Changing Directional Traffic Flow and Turn Radius Improvements) on SR-53 (US-231 and US-411)/Courthouse Square and SR-25 (US-411) in Ashville. Length 0.321 mi.
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Roadway Improvements (Changing Directional Traffic Flow and Turn Radius Improvements) on SR-53 (US-231 and US-411)/Courthouse Square and SR-25 (US-411) in Ashville. Length 0.321 mi.
AvailableAlabama Department of Transportation
Work includes constructing the Planing, Resurfacing, Traffic Signal Upgrade (Signal Backplate Installation), Guardrail Installation, and Traffic Stripe on SR-215 (Greensboro Avenue) from the intersection of SR-7 (US-11/Skyland Boulevard) to the intersection of 10th Avenue in Tuscaloosa. Length 1.290 mi.
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Planing, Resurfacing, Traffic Signal Upgrade (Signal Backplate Installation), Guardrail Installation, and Traffic Stripe on SR-215 (Greensboro Avenue) from the intersection of SR-7 (US-11/Skyland Boulevard) to the intersection of 10th Avenue in Tuscaloosa. Length 1.290 mi.
AvailableAlabama Department of Transportation
Work includes constructing the Intersection Improvements (Grading, Drainage, Pavement, and Traffic Stripe) on SR-12 (US-84) at Broadway Street in Ashford. Length 0.254 mi.
Posted Date
-
Due Date
Dec 5, 2025
Release: -
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Intersection Improvements (Grading, Drainage, Pavement, and Traffic Stripe) on SR-12 (US-84) at Broadway Street in Ashford. Length 0.254 mi.
AvailableCity of Columbus
The City of Columbus, Mississippi seeks bids for the Waterworks Road / Tuscaloosa Road Over Luxapallia Creek Waterline Replacement Project, involving removal and salvage of existing waterlines, installation of steel casing and ductile iron pipes, gate valve installation, and associated construction work.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
City of Columbus
Close: Dec 15, 2025
The City of Columbus, Mississippi seeks bids for the Waterworks Road / Tuscaloosa Road Over Luxapallia Creek Waterline Replacement Project, involving removal and salvage of existing waterlines, installation of steel casing and ductile iron pipes, gate valve installation, and associated construction work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis