Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Texas A&M University System
Procurement of synchronized video cameras and accessories, with Qualysis specified for illustrative purposes, and equivalents considered.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Texas A&M University
Synchronized video cameras and accessories.
Posted Date
Nov 25, 2025
Due Date
Dec 11, 2025
Release: Nov 25, 2025
Texas A&M University
Close: Dec 11, 2025
Synchronized video cameras and accessories.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Texas A&M University System
Invitation for bid to procure synchronized video cameras and accessories for Texas A&M University System. Delivery and performance are to College Station, TX with shipping and customs costs included in the bid price.
Posted Date
Dec 3, 2025
Due Date
Dec 11, 2025
Release: Dec 3, 2025
Texas A&M University System
Close: Dec 11, 2025
Invitation for bid to procure synchronized video cameras and accessories for Texas A&M University System. Delivery and performance are to College Station, TX with shipping and customs costs included in the bid price.
AvailablePEO IEW&S Aberdeen
Synchronized persistent army experimentation (SPARX).
Posted Date
Apr 15, 2025
Due Date
Apr 14, 2030
Release: Apr 15, 2025
PEO IEW&S Aberdeen
Close: Apr 14, 2030
Synchronized persistent army experimentation (SPARX).
Available241-Network Contract Office 01 (36C241)
Chapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
241-Network Contract Office 01 (36C241)
Close: Dec 18, 2025
Chapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →