Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1 LS clearing and grubbing; 2,737 LF 0 to 6' deep gravity sewer pipe; 17 EA lateral connections; 4,807 LF seeding; 800 CY rock excavation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
San Antonio Water System (SAWS) is soliciting bids for construction of the Stonehill Off-Site Sewer Extension Phase II Project in Bexar County, Texas. The scope is typical of sanitary sewer extension work and is expected to include installation of new gravity mains, manholes, and related appurtenances to extend service off site. This is a public works construction bid, not a grant program, and is posted on SAWS’s official CivCast procurement portal.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
San Antonio Water System (SAWS) is soliciting bids for construction of the Stonehill Off-Site Sewer Extension Phase II Project in Bexar County, Texas. The scope is typical of sanitary sewer extension work and is expected to include installation of new gravity mains, manholes, and related appurtenances to extend service off site. This is a public works construction bid, not a grant program, and is posted on SAWS’s official CivCast procurement portal.
Project includes 1,470 tons of asphalt paving; 4,475 Tons of base aggregate; 11,200 SF of concrete flatwork; 3,000 LF of curb and gutter; 1,000 LF of storm sewer with manholes and inlets; 1,480 LF of water main and appurtenances; 1,500 LF of sanitary sewer with manholes, rock excavation, embankment fill, erosion control, restoration, and traffic control.
Posted Date
Jan 1, 2026
Due Date
Jan 22, 2026
Release: Jan 1, 2026
Close: Jan 22, 2026
Project includes 1,470 tons of asphalt paving; 4,475 Tons of base aggregate; 11,200 SF of concrete flatwork; 3,000 LF of curb and gutter; 1,000 LF of storm sewer with manholes and inlets; 1,480 LF of water main and appurtenances; 1,500 LF of sanitary sewer with manholes, rock excavation, embankment fill, erosion control, restoration, and traffic control.
AvailableProject involves 2513 LF Gravity Sewer Pipe - Size 18" Type PVC (includes excavation, bedding, backfill, etc.); 2513 LF CCTV Inspection - Size 18"; 9 EA Sanitary Sewer Manhole - Type 'A'; 2 EA Connection to Existing Manhole; 20 LF Pressure Sewer Pipe; 1202 LF Abandon Sewer Pipe.
Posted Date
Dec 29, 2025
Due Date
Jan 21, 2026
Release: Dec 29, 2025
Close: Jan 21, 2026
Project involves 2513 LF Gravity Sewer Pipe - Size 18" Type PVC (includes excavation, bedding, backfill, etc.); 2513 LF CCTV Inspection - Size 18"; 9 EA Sanitary Sewer Manhole - Type 'A'; 2 EA Connection to Existing Manhole; 20 LF Pressure Sewer Pipe; 1202 LF Abandon Sewer Pipe.
AvailableProcurement of labor, materials, and equipment for the Sherry Drive Water Main Extension Phase II project, involving the furnishing and installation of approximately 3,887 linear feet of various diameter PVC water main using horizontal directional drilling and direct bury methods, including all associated pipes, fittings, valves, and appurtenances.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Procurement of labor, materials, and equipment for the Sherry Drive Water Main Extension Phase II project, involving the furnishing and installation of approximately 3,887 linear feet of various diameter PVC water main using horizontal directional drilling and direct bury methods, including all associated pipes, fittings, valves, and appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →