Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN BUILD: Project consists of the design and construction of a new multi-story science building of approximately 56,500 gsf. Trades: roof and deck insulation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of perform construction of industrial electrical power distribution and control systems at water and wastewater facilities, and the delivery, storage, handling, installation, and testing and commissioning of equipment which include, anchors, fasteners, hangers and supports for the electrical equipment. Low and medium voltage fused and non-fused disconnect switches.
Posted Date
-
Due Date
Dec 31, 2026
Release: -
Close: Dec 31, 2026
Work consists of perform construction of industrial electrical power distribution and control systems at water and wastewater facilities, and the delivery, storage, handling, installation, and testing and commissioning of equipment which include, anchors, fasteners, hangers and supports for the electrical equipment. Low and medium voltage fused and non-fused disconnect switches.
AvailableSouthern Illinois University Edwardsville (SIUE) posted an RFI requesting prequalification statements from contractors for the 2025 cycle, with submission instructions and required forms listed on the buyer's bulletin page. Responses are due by 3:00 PM Central on December 31, 2025, and the primary prequalification document is referenced on the bulletin but requires a bulletin account to download.
Posted Date
Dec 5, 2024
Due Date
Dec 31, 2025
Release: Dec 5, 2024
Close: Dec 31, 2025
Southern Illinois University Edwardsville (SIUE) posted an RFI requesting prequalification statements from contractors for the 2025 cycle, with submission instructions and required forms listed on the buyer's bulletin page. Responses are due by 3:00 PM Central on December 31, 2025, and the primary prequalification document is referenced on the bulletin but requires a bulletin account to download.
AvailableContractor prequalification for educational facilities construction projects and repairs.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Contractor prequalification for educational facilities construction projects and repairs.
AvailableRequests qualified and experienced DCAMM Certified Elevator Trade Contractors submit Statements of Qualifications for the Prequalification of the Auburn Fire Rescue Headquarters. This RFQ is for prequalification only.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Requests qualified and experienced DCAMM Certified Elevator Trade Contractors submit Statements of Qualifications for the Prequalification of the Auburn Fire Rescue Headquarters. This RFQ is for prequalification only.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis