Summary
Construct a seepage monitoring system for weir 3 at swift no. 2 hydroelectric. This section covers the requirements for control and disposal of water during construction. Control and disposal of water include to, construction of ditches, culverts, pumping, draining and other measures required for the removal or exclusion of water from the foundation, excavation and work area. Erosion and sediment control measures shall be installed in accordance with specification 02271 - erosion and sediment control. Dewatering includes to sump development, pumping, piping, ditching, draining and other measures required for the removal or exclusion of water from the construction area throughout the entire period of construction. This also includes the control, treatment (if necessary), and disposal of water produced during foundation dewatering operations.