Summary
Work includes removal of existing epdm membrane, battens, fasteners, sealants and insulation boards, all preparation of existing roof and surrounding curbs/parapets and penetrations on the control building roof (approx 2,150 SF); remove and dispose of control room parapet wall stone coping; installation of new fully adhered roof consisting of tapered insulation board, all fasteners, adhesives and sealants, epdm (60 mil carbon black) nonreinforced membrane, treated wooden nailers, splice tape, all flashing and counter flashing, new aluminum edging and counter flashing along parapet walls, termination bars, end treatments, base flashing for heat stacks, fan/exhaust and roof penetrations on the control building roof (approx 2,150 SF); etc, see attached file.