Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes miscellaneous wastewater upgrades contract no. 1 lagoon sludge removal and pump replacement. Sludge dredging, dewatering, and disposal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Premium
Access the largest public sector contact database
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
AvailableOWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
AvailablePurchase of sludge dewatering (bfp) treatment polymer for nfwb facilities.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Purchase of sludge dewatering (bfp) treatment polymer for nfwb facilities.
AvailableProvide fabrication and delivery of a complete solids dewatering system and ancillary components, design assistance, submittals and shop drawings, operations manual, factory testing, on-site testing and start-up, testing, training and post-commissioning assistance.
Posted Date
Dec 1, 2025
Due Date
Dec 23, 2025
Release: Dec 1, 2025
Close: Dec 23, 2025
Provide fabrication and delivery of a complete solids dewatering system and ancillary components, design assistance, submittals and shop drawings, operations manual, factory testing, on-site testing and start-up, testing, training and post-commissioning assistance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis