Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
AvailableBypass channel north project.
Posted Date
Mar 31, 2025
Due Date
Jan 5, 2026
Release: Mar 31, 2025
Close: Jan 5, 2026
Bypass channel north project.
AvailableOWASA is seeking statements of qualifications from engineering firms to design and permit rehabilitation and scour remediation for the access bridge to the Mason Farm Wastewater Treatment Plant. The scope includes scour protection, patching of concrete cored slabs and wingwalls, and metal rail repairs.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
OWASA is seeking statements of qualifications from engineering firms to design and permit rehabilitation and scour remediation for the access bridge to the Mason Farm Wastewater Treatment Plant. The scope includes scour protection, patching of concrete cored slabs and wingwalls, and metal rail repairs.
AvailableOWASA seeks qualified engineering firms to provide design, permitting, bidding assistance, and construction-phase engineering services for rehabilitation and scour remediation of the Mason Farm WWTP access bridge, including scour protection, concrete slab and wingwall repairs, and metal rail repairs.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
OWASA seeks qualified engineering firms to provide design, permitting, bidding assistance, and construction-phase engineering services for rehabilitation and scour remediation of the Mason Farm WWTP access bridge, including scour protection, concrete slab and wingwall repairs, and metal rail repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis