Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase, deliver, and install two submersible tank mixers. The final installation shall include electrical connections.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project is an improvement to an existing water treatment plant. The existing plant is to remain fully operational during construction and in full compliance with all regulatory requirements placed on the CITY by the Department of Public Health. The work includes: Sand blast and recoat Tank No. 1 and No. 2 (both interior and exterior). Remove existing baffle walls and supports in the tanks. Install new tank mixer and control panels. Replace existing cathodic protection with new cathodic protection. Replace the existing pressure transmitter with a new transmitter for both tanks. Demolish existing submersible pumps and appurtenances. Install new package lift station.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 9, 2026
This project is an improvement to an existing water treatment plant. The existing plant is to remain fully operational during construction and in full compliance with all regulatory requirements placed on the CITY by the Department of Public Health. The work includes: Sand blast and recoat Tank No. 1 and No. 2 (both interior and exterior). Remove existing baffle walls and supports in the tanks. Install new tank mixer and control panels. Replace existing cathodic protection with new cathodic protection. Replace the existing pressure transmitter with a new transmitter for both tanks. Demolish existing submersible pumps and appurtenances. Install new package lift station.
AvailableLafourche Parish Water District No.1 seeks contractors to furnish and install two new 20 HP rapid mixers and a 1-ton manual chain hoist and trolley, remove existing mixers and associated appurtenances, and perform all related electrical work. The project aims to upgrade rapid mixing capability at the North Plant to improve operational efficiency. The procurement was posted Jan 20, 2026 and bids are due Feb 18, 2026.
Posted Date
Jan 20, 2026
Due Date
Feb 18, 2026
Release: Jan 20, 2026
Close: Feb 18, 2026
Lafourche Parish Water District No.1 seeks contractors to furnish and install two new 20 HP rapid mixers and a 1-ton manual chain hoist and trolley, remove existing mixers and associated appurtenances, and perform all related electrical work. The project aims to upgrade rapid mixing capability at the North Plant to improve operational efficiency. The procurement was posted Jan 20, 2026 and bids are due Feb 18, 2026.
AvailableInstallation of cathodic protection systems for the tank walls and tank floors. Cleaning, preparation, and lining of the interior of the reclamation water storage tanks, including all columns and piping within the tanks. Sealing of the roof to rim angle connection and the roof lap seams in the reclamation water storage tanks. Installation of grounding assemblies for each tank. Safety sign postage at each tank.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
Installation of cathodic protection systems for the tank walls and tank floors. Cleaning, preparation, and lining of the interior of the reclamation water storage tanks, including all columns and piping within the tanks. Sealing of the roof to rim angle connection and the roof lap seams in the reclamation water storage tanks. Installation of grounding assemblies for each tank. Safety sign postage at each tank.
AvailableThe Department of the Air Force (Pacific Air Forces) is soliciting proposals for the installation of submersible water well pumps at two well sites (Ushi and M-10) at Tinian North Field in the Commonwealth of the Northern Mariana Islands. This project aims to establish a reliable non-potable water source for dust suppression, soil conditioning, and general field uses. The procurement is a Total Small Business set-aside requiring offerors to maintain an active PIEE profile for award eligibility.
Posted Date
Jan 22, 2026
Due Date
Jan 28, 2026
Release: Jan 22, 2026
Close: Jan 28, 2026
The Department of the Air Force (Pacific Air Forces) is soliciting proposals for the installation of submersible water well pumps at two well sites (Ushi and M-10) at Tinian North Field in the Commonwealth of the Northern Mariana Islands. This project aims to establish a reliable non-potable water source for dust suppression, soil conditioning, and general field uses. The procurement is a Total Small Business set-aside requiring offerors to maintain an active PIEE profile for award eligibility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →