Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of equipment, labor, and materials for the replacement of an existing 4-pipe air handling unit with a new split-system electric heat-pump air handler, HVAC controls, and electrical alterations, including Elevator Code compliance improvements, new emergency power circuits, and modifications to power separation, lighting, and fire alarm systems for the Studebaker West Elevator E3-E4.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The "Cheney HVAC System Rebid Project" is an open Invitation to Bid (ITB) issued by the Park District of Oak Park, Illinois. The project involves the full installation of HVAC equipment, ductwork, electrical work, and existing geothermal well manifold hookups and components, with a Base Bid and two Alternates. A non-mandatory pre-bid walk-thru is scheduled for January 9th, 2026, and bids are due by January 28th, 2026.
Posted Date
Dec 29, 2025
Due Date
Jan 28, 2026
Release: Dec 29, 2025
Close: Jan 28, 2026
The "Cheney HVAC System Rebid Project" is an open Invitation to Bid (ITB) issued by the Park District of Oak Park, Illinois. The project involves the full installation of HVAC equipment, ductwork, electrical work, and existing geothermal well manifold hookups and components, with a Base Bid and two Alternates. A non-mandatory pre-bid walk-thru is scheduled for January 9th, 2026, and bids are due by January 28th, 2026.
AvailableVan Dyke Public Schools is soliciting bids for an Electrical Rebid (Electrical Work Package #3) for the 2026 Lincoln High School Improvements project. Bid documents are available electronically (Procore) on or about December 18, 2025, and a pre-bid meeting is scheduled for January 8, 2026, at 2:00 PM local time. Bids will be received and publicly opened on January 29, 2026, at 2:00 PM local time; the Owner (Van Dyke Public Schools) reserves the right to accept or reject any or all bids.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Van Dyke Public Schools is soliciting bids for an Electrical Rebid (Electrical Work Package #3) for the 2026 Lincoln High School Improvements project. Bid documents are available electronically (Procore) on or about December 18, 2025, and a pre-bid meeting is scheduled for January 8, 2026, at 2:00 PM local time. Bids will be received and publicly opened on January 29, 2026, at 2:00 PM local time; the Owner (Van Dyke Public Schools) reserves the right to accept or reject any or all bids.
Provide monthly elevator preventative maintenance, repairs, and emergency response (call-back) services for one (1) Otis Passenger Elevator.
Posted Date
Nov 26, 2025
Due Date
Jan 28, 2026
Release: Nov 26, 2025
Close: Jan 28, 2026
Provide monthly elevator preventative maintenance, repairs, and emergency response (call-back) services for one (1) Otis Passenger Elevator.
AvailableThe project consists of the full installation of all HVAC equipment, necessary ductwork, electrical work, existing geothermal well manifold hookups and components. There will be a Base Bid and 2 Alternates.
Posted Date
Sep 17, 2025
Due Date
Jan 28, 2026
Release: Sep 17, 2025
Close: Jan 28, 2026
The project consists of the full installation of all HVAC equipment, necessary ductwork, electrical work, existing geothermal well manifold hookups and components. There will be a Base Bid and 2 Alternates.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis