Summary
Work will include surface preparation, asphalt paving, and any associated work needed to complete the project to city and industry standards. Work - Milling and surface preparation. Asphalt paving/leveling to specified thickness and width. Installation of traffic control measures during work. Clean-up and proper disposal of debris. Compliance with all applicable local, state, and federal regulations. COB will Clean up and Remove clippings after paving is complete. Final adjustment of manholes and water valves will be responsibility of COB. Contractor shall mark manholes and water valves manually and with GPS. This contract excludes any permanent pavement markings Specific streets and lengths are listed in Attachment A.