Summary
This project consists of construction of clearing and grubbing within the drainage district main open ditch, 450 stations of open ditch excavation, 402 stations of two-sided spoil bank leveling, 48 stations of one-sided spoil leveling, 450 stations of open ditch seeding and fertilizing, rip rap placement, repairs to surface drainpipes and tile extension pipes. Approx 2,000 LF of 12" CMP Tile Extension; 400 LF of 15" CMP Tile Extension; 200 LF of 18" CMP Tile Extension; 200 LF of 24" CMP Tile Extension; 100 LF of 30" CMP Tile Extension; 20 LF of 42" CMP Tile Extension; 1,000 LF of 18" CMP Surface drain.