Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sale of 8' x 16' storage shed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for the construction of a new storage shed and headhouse at Shone Farm, with an estimated budget of $105,000.00, open to pre-qualified CUPCCAA contractors.
Posted Date
Dec 10, 2025
Due Date
Jan 16, 2026
Release: Dec 10, 2025
Close: Jan 16, 2026
Procurement for the construction of a new storage shed and headhouse at Shone Farm, with an estimated budget of $105,000.00, open to pre-qualified CUPCCAA contractors.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of a turnkey demolition and replacement of an existing storage shed with a new pre-engineered metal building, including site preparation, foundation work, installation, and site restoration.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Procurement of a turnkey demolition and replacement of an existing storage shed with a new pre-engineered metal building, including site preparation, foundation work, installation, and site restoration.
AvailableThe work of this contract may consist of the following: new modular 12’ X 24’ storage shed and 28’ x 28' headhouse - for staff use only and for non-educational use. Minor electrical work at headhouse. Add lighting, power outlets, and connection for ceiling fans. Minor plumbing work at headhouse. Add outdoor utility sink, interior hose bibb, and catch basin brain. Sitework: new concrete paving around buildings.
Posted Date
Dec 10, 2025
Due Date
Jan 16, 2026
Release: Dec 10, 2025
Close: Jan 16, 2026
The work of this contract may consist of the following: new modular 12’ X 24’ storage shed and 28’ x 28' headhouse - for staff use only and for non-educational use. Minor electrical work at headhouse. Add lighting, power outlets, and connection for ceiling fans. Minor plumbing work at headhouse. Add outdoor utility sink, interior hose bibb, and catch basin brain. Sitework: new concrete paving around buildings.
AvailableThe Texas Department of Transportation (TxDOT) issued a State Let Maintenance Contract solicitation for construction of a salt and sand storage shed along US 277 in Baylor County, Texas. The project has an estimated cost of $185,000 and requires completion within 140 working days from the start date. Responses are due on January 7, 2026 at 1:00 PM (CST) and the posting was published on December 12, 2025.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
The Texas Department of Transportation (TxDOT) issued a State Let Maintenance Contract solicitation for construction of a salt and sand storage shed along US 277 in Baylor County, Texas. The project has an estimated cost of $185,000 and requires completion within 140 working days from the start date. Responses are due on January 7, 2026 at 1:00 PM (CST) and the posting was published on December 12, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →