Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove existing 7'-4" x 5'-6" CMP Elliptical culvert and replace with a new 10'-6" x 5'-7" Bottomless Aluminum Box Culvert complete with aluminum footing plates, lean concrete sub-footers and aluminum structural plate endwalls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Prepare an excavation bid for the ward brook road culvert replacement. The new culvert is an 11' x 3.5' x 38' long single radius pipe arch with concrete footings and headwalls.
Posted Date
Dec 10, 2025
Due Date
Dec 29, 2025
Release: Dec 10, 2025
Close: Dec 29, 2025
Prepare an excavation bid for the ward brook road culvert replacement. The new culvert is an 11' x 3.5' x 38' long single radius pipe arch with concrete footings and headwalls.
AvailablePremium
Access the largest public sector contact database
Release: Nov 18, 2025
Close: Dec 16, 2025
Culvert replacement project.
AvailableRoad culvert replacement.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
Road culvert replacement.
AvailableSealed ITB for construction of a new 12‑foot diameter roadway culvert to replace two failed culverts (highway/road construction). Key response requirements: mandatory pre‑bid meeting attendance, ODOT prequalification in the applicable class, electronic submission via the Multco Marketplace, bid bond and specified construction contract documents. Engineer's estimate: $2.4M–$2.6M.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
Close: Dec 16, 2025
Sealed ITB for construction of a new 12‑foot diameter roadway culvert to replace two failed culverts (highway/road construction). Key response requirements: mandatory pre‑bid meeting attendance, ODOT prequalification in the applicable class, electronic submission via the Multco Marketplace, bid bond and specified construction contract documents. Engineer's estimate: $2.4M–$2.6M.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis