Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Commonwealth University of Pennsylvania – Lock Haven Campus (PASSHE) is soliciting bids to replace the Stevenson Library chiller system, including demolition of the existing roof‑mounted unit and installation of a new air‑cooled pad‑mounted scroll chiller, buffer tank, pumps, VFDs, and associated BAS modifications. Bids are submitted via PennBid; a mandatory pre‑bid is scheduled for Nov 20, 2025, and bids are due Dec 17, 2025 at 1:00 PM Eastern.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Work included under this Project consists of Mechanical and Electrical Demolition of existing roof-mounted chiller, dunnage, chilled water piping, pumps, heat exchanger and electrical as required. Provide air-cooled pad-mounted scroll chiller including piping, supports, insulation, chiller, support pad, and equipment enclosure, chilled water buffer tank including pad support and tank insulation chiller water pumps, hydronic specialties, pads, insulation enclosures, and variable frequency drives, modifications to BAS for new chiller plant and testing, adjusting and balancing. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the Mechanical Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Work included under this Project consists of Mechanical and Electrical Demolition of existing roof-mounted chiller, dunnage, chilled water piping, pumps, heat exchanger and electrical as required. Provide air-cooled pad-mounted scroll chiller including piping, supports, insulation, chiller, support pad, and equipment enclosure, chilled water buffer tank including pad support and tank insulation chiller water pumps, hydronic specialties, pads, insulation enclosures, and variable frequency drives, modifications to BAS for new chiller plant and testing, adjusting and balancing. Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the Mechanical Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents.
AvailableLock Haven Campus (CWU) is seeking bids from HVAC and Electrical contractors for the removal of an existing roof-mounted chiller and installation of an air-cooled pad-mounted scroll chiller. The project involves associated piping, pumps, controls, supports, and testing/commissioning, with the Mechanical Contractor as the Lead Prime. Electronic bids are due through PennBid on December 17, 2025, following a mandatory pre-bid/site visit on November 20, 2025.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
Lock Haven Campus (CWU) is seeking bids from HVAC and Electrical contractors for the removal of an existing roof-mounted chiller and installation of an air-cooled pad-mounted scroll chiller. The project involves associated piping, pumps, controls, supports, and testing/commissioning, with the Mechanical Contractor as the Lead Prime. Electronic bids are due through PennBid on December 17, 2025, following a mandatory pre-bid/site visit on November 20, 2025.
AvailableThe City of Brandon is soliciting sealed bids for replacement of the chiller at the Brandon Library, including all labor, equipment, materials, engineering support, and programming for a new web-based energy management and control system. Bidders must submit duplicate sealed proposals with a 5% bid bond or certified check and deliver them to the City Clerk prior to 10:00 A.M. local time on December 30, 2025.
Posted Date
Nov 20, 2025
Due Date
Dec 30, 2025
Release: Nov 20, 2025
Close: Dec 30, 2025
The City of Brandon is soliciting sealed bids for replacement of the chiller at the Brandon Library, including all labor, equipment, materials, engineering support, and programming for a new web-based energy management and control system. Bidders must submit duplicate sealed proposals with a 5% bid bond or certified check and deliver them to the City Clerk prior to 10:00 A.M. local time on December 30, 2025.
AvailableProvide Chiller Replacement .
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Close: Dec 16, 2025
Provide Chiller Replacement .
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis