Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Anne Arundel County
Construction of the steel bridge joint rehabilitation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pennsylvania Turnpike Commission - Purchasing
Work includes 29,023 SF of high strength fiber wrap; 600 SF of concrete bridge deck repair type 3; 2,505 SF of concrete bridge deck repair accelerated, type 2 using asc; 2,640 SY of scarification, 1/2" depth; 10,210 SY of epoxy overlay; 1,320 SY of latex modified concrete wearing surface, 1 1/4" depth; 46 CY of latex modified concrete, variable depth; 2,101 SF of class aa cement concrete repairs; 624 LF of neoprene strip seal gland replacement; 427 SF of prestressed concrete beam repairs; 120 LF of emseal expansion joint seal; 200 LF of precast concrete median barrier, structure mounted.
Posted Date
Oct 11, 2025
Due Date
Nov 26, 2025
Release: Oct 11, 2025
Pennsylvania Turnpike Commission - Purchasing
Close: Nov 26, 2025
Work includes 29,023 SF of high strength fiber wrap; 600 SF of concrete bridge deck repair type 3; 2,505 SF of concrete bridge deck repair accelerated, type 2 using asc; 2,640 SY of scarification, 1/2" depth; 10,210 SY of epoxy overlay; 1,320 SY of latex modified concrete wearing surface, 1 1/4" depth; 46 CY of latex modified concrete, variable depth; 2,101 SF of class aa cement concrete repairs; 624 LF of neoprene strip seal gland replacement; 427 SF of prestressed concrete beam repairs; 120 LF of emseal expansion joint seal; 200 LF of precast concrete median barrier, structure mounted.
AvailableLyon County
For steel bridge decking.
Posted Date
Nov 11, 2025
Due Date
Dec 8, 2025
Release: Nov 11, 2025
Lyon County
Close: Dec 8, 2025
For steel bridge decking.
AvailableAndrew County
Construction of an 80' long single span steel girder bridge and associated roadway work.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
Andrew County
Close: Dec 4, 2025
Construction of an 80' long single span steel girder bridge and associated roadway work.
AvailableTransportation Research Board
The objective of this research is to develop a calibrated probabilistic deterioration model for design to make informed decisions about the target service life of nonrenewable steel bridge (NSB) elements under varied corrosion protection strategies and environmental conditions.
Posted Date
Nov 10, 2025
Due Date
Jan 7, 2026
Release: Nov 10, 2025
Transportation Research Board
Close: Jan 7, 2026
The objective of this research is to develop a calibrated probabilistic deterioration model for design to make informed decisions about the target service life of nonrenewable steel bridge (NSB) elements under varied corrosion protection strategies and environmental conditions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis