Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 1 LS mobilization, 6 EA changeable message sign, 500 LF 6" white thermoplastic stripe, 102 LF bridge joint repair, 13 CY polyester polymer concrete overlay.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge repair work includes approx. 6 SF general epoxy repair, 4 EA changeable message sign, 360 LF 6" white thermoplastic stripe.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Bridge repair work includes approx. 6 SF general epoxy repair, 4 EA changeable message sign, 360 LF 6" white thermoplastic stripe.
AvailableWork includes approx. 2 EA changeable message sign, 310 LF 6" white thermoplastic traffic stripe, 1,336 LF joint repair, 1,336 LF saw cut, 46 CY hybrid polymer concrete overlay.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Work includes approx. 2 EA changeable message sign, 310 LF 6" white thermoplastic traffic stripe, 1,336 LF joint repair, 1,336 LF saw cut, 46 CY hybrid polymer concrete overlay.
AvailableBridge repair work includes approx. 267 SY fine milling, 1,500 LF concrete median barrier, 2 EA changeable message sign, 3,800 LF 6" white thermoplastic stripe, 330 CY bridge deck overlay concrete, 470 LF saw cut.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Bridge repair work includes approx. 267 SY fine milling, 1,500 LF concrete median barrier, 2 EA changeable message sign, 3,800 LF 6" white thermoplastic stripe, 330 CY bridge deck overlay concrete, 470 LF saw cut.
AvailableThe Town of Hebron is soliciting sealed bids to replace Bridge No. 04695 carrying Old Colchester Road over Raymond Brook. This Federal-aid, CTDOT-administered local bridge project requires CTDOT prequalification and compliance with DBE and prevailing wage requirements, with plans/specs distributed via the Advanced Reprographics planroom. The bid due date was revised to January 20, 2026 at 1:00 PM local time.
Posted Date
Nov 25, 2025
Due Date
Jan 20, 2026
Release: Nov 25, 2025
Close: Jan 20, 2026
The Town of Hebron is soliciting sealed bids to replace Bridge No. 04695 carrying Old Colchester Road over Raymond Brook. This Federal-aid, CTDOT-administered local bridge project requires CTDOT prequalification and compliance with DBE and prevailing wage requirements, with plans/specs distributed via the Advanced Reprographics planroom. The bid due date was revised to January 20, 2026 at 1:00 PM local time.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis