Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 825 LF HP 12 x 84 steel piling, 224 LF 25' prestressed concrete beam, 150 LF 36" concrete railing, 53 CY bridge concrete, 6 CY hybrid polymer concrete overlay, 1 LS clearing & grubbing, 208 CY unclassified excavation, 36 SY solid sodding, 222 SY ditch liner, 1 Thousand gallon watering, 1 AC insect pest control, 1 AC mowing, 20 TN riprap for erosion control, 866 SY fine milling, 113 Gal asphalt for tack coat, 39 LF 4" perforated sewer pipe for underdrain, 150 LF guardrail, signage, pavement marking.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 1,477 SY transverse grooving, 2,005 LF 30" steel pipe piling, wall thickness 0. 500", 1,880 LF 20" steel pipe piling, wall thickness 0.500", 1,193 LF 80' prestressed concrete beam, type fib-36 995 LF prestressed concrete beam, type fib-36, 137,144 pounds reinforcement, 5,191 pounds reinforcement, corrosion resistant, 886 LF concrete railing, 36", 698 ton loose riprap, size 300, 644 SY geotextile under riprap, 463 CY bridge concrete, class bdx, 149 CY bridge concrete, class aa 98 LF preformed joint seal, type i, 1,104 ton 9. 5-mm, st, asphalt pavement. See attached file.
Posted Date
Oct 6, 2025
Due Date
Jan 27, 2026
Release: Oct 6, 2025
Close: Jan 27, 2026
Work includes 1,477 SY transverse grooving, 2,005 LF 30" steel pipe piling, wall thickness 0. 500", 1,880 LF 20" steel pipe piling, wall thickness 0.500", 1,193 LF 80' prestressed concrete beam, type fib-36 995 LF prestressed concrete beam, type fib-36, 137,144 pounds reinforcement, 5,191 pounds reinforcement, corrosion resistant, 886 LF concrete railing, 36", 698 ton loose riprap, size 300, 644 SY geotextile under riprap, 463 CY bridge concrete, class bdx, 149 CY bridge concrete, class aa 98 LF preformed joint seal, type i, 1,104 ton 9. 5-mm, st, asphalt pavement. See attached file.
AvailableBridge repair work includes approx. 267 SY fine milling, 1,500 LF concrete median barrier, 2 EA changeable message sign, 3,800 LF 6" white thermoplastic stripe, 330 CY bridge deck overlay concrete, 470 LF saw cut.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Bridge repair work includes approx. 267 SY fine milling, 1,500 LF concrete median barrier, 2 EA changeable message sign, 3,800 LF 6" white thermoplastic stripe, 330 CY bridge deck overlay concrete, 470 LF saw cut.
AvailableWork includes bridge joint replacement.
Posted Date
Dec 16, 2025
Due Date
Jan 14, 2026
Release: Dec 16, 2025
Close: Jan 14, 2026
Work includes bridge joint replacement.
AvailableTDOT solicits CM/GC preconstruction services (with option to negotiate construction under a GMP) for the SR-1 Bridge Replacement over the North Fork Holston River (Hawkins & Sullivan Counties, TN). Key commercial points: preconstruction services estimate not to exceed $450,000; estimated construction cost ~$50,000,000; CM/GC must self-perform at least 30% of construction; surety letter showing bonding capacity ≥ $50,000,000 required; minimum insurance and TDOT prequalification required; mandatory pre-proposal meeting (failure to attend results in elimination); environmental clearance pending and construction proceeds only after GMP acceptance. Organizational conflict restrictions list several firms that cannot participate on proposer teams.
Posted Date
Dec 4, 2025
Due Date
Feb 6, 2026
Release: Dec 4, 2025
Close: Feb 6, 2026
TDOT solicits CM/GC preconstruction services (with option to negotiate construction under a GMP) for the SR-1 Bridge Replacement over the North Fork Holston River (Hawkins & Sullivan Counties, TN). Key commercial points: preconstruction services estimate not to exceed $450,000; estimated construction cost ~$50,000,000; CM/GC must self-perform at least 30% of construction; surety letter showing bonding capacity ≥ $50,000,000 required; minimum insurance and TDOT prequalification required; mandatory pre-proposal meeting (failure to attend results in elimination); environmental clearance pending and construction proceeds only after GMP acceptance. Organizational conflict restrictions list several firms that cannot participate on proposer teams.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis