Summary
The project consists of Installing an ADA-accessible single-vessel floating kayak launch complete with a 40' by 5' gangway system; Constructing a 6' wide, 185 SF timber pile-supported boardwalk supported on the landward side by a reinforced concrete abutment; Installing timber ice protection piles upstream of all in-water improvements; Site grading for proposed and future parking areas, driveways, sidewalks and stormwater detention basins; HMA paving for proposed parking areas and drives; Constructing a reinforced concrete boat ramp utilizing a cast-in-place or precast concrete panel system complete with surface texturing, rubber belt wheel stops, and riprap toe protection; Furnishing and installing a 40' by 5' removable timber skid pier; Constructing ADA-compliant 4" non-reinforced porous concrete sidewalks; Installing proposed storm sewer piping and associated drainage structures; Furnishing and installing miscellaneous site amenities including bench seating, trash and recycling receptacles, pavement markings and symbols, ADA signage, and park signage, and Site restoration, seeding, and landscaping with specified seed mixes and native plantings as identified in the project plans. Execute Soil Erosion & Sedimentation Control measures per BCDC requirements.