Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrades and repairs to the Squannacook River Dam.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for the inspection and improvements of the Verdigris River Low-Head Dam.
Posted Date
Nov 19, 2026
Due Date
Feb 5, 2027
Release: Nov 19, 2026
Close: Feb 5, 2027
Procurement of services for the inspection and improvements of the Verdigris River Low-Head Dam.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking professional engineering firms to provide dam repair and rehabilitation engineering services, including inspection, evaluation, design, permitting, and construction-phase support, for a storm-damaged dam.
Posted Date
Jan 13, 2026
Due Date
Jan 28, 2026
Release: Jan 13, 2026
Close: Jan 28, 2026
Seeking professional engineering firms to provide dam repair and rehabilitation engineering services, including inspection, evaluation, design, permitting, and construction-phase support, for a storm-damaged dam.
AvailableProject generally consists of restoring the functionality of the Diversion Dam by repairing and reinforcing its structure to ensure stability. Additionally, a notch will be added to the dam to facilitate fish passage. The project also includes placing riprap and rocks downstream of the dam, as well as bank revegetation efforts.
Posted Date
Jan 12, 2026
Due Date
Feb 2, 2026
Release: Jan 12, 2026
Close: Feb 2, 2026
Project generally consists of restoring the functionality of the Diversion Dam by repairing and reinforcing its structure to ensure stability. Additionally, a notch will be added to the dam to facilitate fish passage. The project also includes placing riprap and rocks downstream of the dam, as well as bank revegetation efforts.
AvailableMobilization; clearing, grubbing & site preparation; erosion & sediment control; traffic control; temporary cofferdam; 71 cy concrete dam repair; 18 cy rock riprap (d50=18"); miscellaneous concrete repair; cofferdam evacuation. Installation of construction and traffic control signs. Clearing, grubbing and demolition required for this work includes, but is not necessarily limited to: removal of trees, stumps, debris, and brush. Trimming and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal. Removal and disposal of miscellaneous abandoned subsurface structures and debris that may be discovered during the work. See outside link.
Posted Date
Sep 5, 2025
Due Date
Feb 5, 2026
Release: Sep 5, 2025
Close: Feb 5, 2026
Mobilization; clearing, grubbing & site preparation; erosion & sediment control; traffic control; temporary cofferdam; 71 cy concrete dam repair; 18 cy rock riprap (d50=18"); miscellaneous concrete repair; cofferdam evacuation. Installation of construction and traffic control signs. Clearing, grubbing and demolition required for this work includes, but is not necessarily limited to: removal of trees, stumps, debris, and brush. Trimming and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal. Removal and disposal of miscellaneous abandoned subsurface structures and debris that may be discovered during the work. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →