Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Network Contracting Office 7 (VISN 7: Southeast Network, Department of Veterans Affairs) issued a Special Notice of Intent to negotiate a sole-source contract with Thinkform Design Architect LLC (SDVOSB) for bid and construction period services for the Renovate Restrooms, Stairwells, and Doors Project at the Charleston VA Medical Center in Charleston, SC. The notice is informational (not a request for quotes or proposals) and explicitly states no solicitation document exists; capability statements may be submitted to the listed contact by Jan 23, 2026. The posting is active and listed as Open on the official source as of 2026-01-13.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7 has issued a Special Notice for architectural and engineering services to renovate restrooms, stairwells, and doors at the Charleston VA Medical Center. The agency intends to make a sole-source award to Thinkform Design Architect LLC, an SDVOSB, under VAAR 819.7008. Interested sources may submit capability statements to Christopher.jenkins@va.gov by January 23, 2026, at 12:00 PM Eastern Time.
Posted Date
Jan 12, 2026
Due Date
Jan 23, 2026
Release: Jan 12, 2026
Close: Jan 23, 2026
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7 has issued a Special Notice for architectural and engineering services to renovate restrooms, stairwells, and doors at the Charleston VA Medical Center. The agency intends to make a sole-source award to Thinkform Design Architect LLC, an SDVOSB, under VAAR 819.7008. Interested sources may submit capability statements to Christopher.jenkins@va.gov by January 23, 2026, at 12:00 PM Eastern Time.
AvailableWork includes burge residence hall - renovate restrooms.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Work includes burge residence hall - renovate restrooms.
AvailableMany restrooms and locker rooms throughout building are out of compliance with the ADA standards for accessibility. This project plans to correct as many of these restrooms/locker rooms as possible within the construction funding limitations as listed below. Please see below for the requirements that must be met with this project: The A/E shall study all restrooms throughout building 1 and 23 and design to meet current VA ADA standards. ; At minimum, 2 patient and public restrooms/locker rooms must be upgraded to be fully compliant with ADA standards for each floor of each building. ; Additional grab bars to be added where required.; Insulate all exposed sink piping in all restrooms/locker rooms subject for public and patient use.; Asbestos sampling and air monitoring must be included as part of the investigation.; Finishes, including toilet partitions, in restrooms may need to be updated and shall be included in this design.; Provide power assist hardware to as many restrooms that fits within the funding limitations. This requirement will be particular to the 7th floor but is not limited to that floor. See attached file.
Posted Date
Jan 14, 2026
Due Date
Jan 23, 2026
Release: Jan 14, 2026
The Department of Veterans Affairs intends to negotiate a sole source Firm-Fixed-Price contract with Stone Group Architects, Inc. (a certified SDVOSB) to provide updated construction documents and Construction Period Services for renovation of the 1st floor, dock, and 180 areas for the kitchen and caf at the Royal C. Johnson Veterans Memorial Hospital (Sioux Falls VA Health Care System). The procurement is classified under NAICS 541330 (Engineering Services) and is a sole-source procurement to a certified SDVOSB. The SAM.gov posting is active and responses are due by Jan 28, 2026 at 2:00 PM CST.
Posted Date
Jan 12, 2026
Due Date
Jan 28, 2026
Release: Jan 12, 2026
Close: Jan 28, 2026
The Department of Veterans Affairs intends to negotiate a sole source Firm-Fixed-Price contract with Stone Group Architects, Inc. (a certified SDVOSB) to provide updated construction documents and Construction Period Services for renovation of the 1st floor, dock, and 180 areas for the kitchen and caf at the Royal C. Johnson Veterans Memorial Hospital (Sioux Falls VA Health Care System). The procurement is classified under NAICS 541330 (Engineering Services) and is a sole-source procurement to a certified SDVOSB. The SAM.gov posting is active and responses are due by Jan 28, 2026 at 2:00 PM CST.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 23, 2026
Many restrooms and locker rooms throughout building are out of compliance with the ADA standards for accessibility. This project plans to correct as many of these restrooms/locker rooms as possible within the construction funding limitations as listed below. Please see below for the requirements that must be met with this project: The A/E shall study all restrooms throughout building 1 and 23 and design to meet current VA ADA standards. ; At minimum, 2 patient and public restrooms/locker rooms must be upgraded to be fully compliant with ADA standards for each floor of each building. ; Additional grab bars to be added where required.; Insulate all exposed sink piping in all restrooms/locker rooms subject for public and patient use.; Asbestos sampling and air monitoring must be included as part of the investigation.; Finishes, including toilet partitions, in restrooms may need to be updated and shall be included in this design.; Provide power assist hardware to as many restrooms that fits within the funding limitations. This requirement will be particular to the 7th floor but is not limited to that floor. See attached file.
Available