Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work involves concrete curbing, catch basins, stamped colored concrete for the splitter islands, and colored concrete for the truck apron around the center island.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide lame deer heliport and concrete support structure remediation. Concrete cracking and spalling and requires complete replacement. The project includes the full demolition and replacement of the existing heliport along with structural concrete remediation work at the ambulance bay, emergency entrance, and loading dock.
Posted Date
Dec 11, 2025
Due Date
Dec 22, 2025
Release: Dec 11, 2025
Close: Dec 22, 2025
Provide lame deer heliport and concrete support structure remediation. Concrete cracking and spalling and requires complete replacement. The project includes the full demolition and replacement of the existing heliport along with structural concrete remediation work at the ambulance bay, emergency entrance, and loading dock.
Premium
Access the largest public sector contact database
The Indian Health Service (IHS), under the Department of Health and Human Services, is conducting a sources sought/request for information (RFI) regarding heliport and concrete support structure remediation services at the Northern Cheyenne Health Center in Lame Deer, Montana. The primary scope of work involves the complete demolition and replacement of the existing heliport and structural remediation of the ambulance bay, emergency entrance, and loading dock. This market research effort is being conducted to identify qualified businesses capable of performing these functions, with responses due by December 22, 2025.
Posted Date
Dec 11, 2025
Due Date
Dec 22, 2025
Release: Dec 11, 2025
Close: Dec 22, 2025
The Indian Health Service (IHS), under the Department of Health and Human Services, is conducting a sources sought/request for information (RFI) regarding heliport and concrete support structure remediation services at the Northern Cheyenne Health Center in Lame Deer, Montana. The primary scope of work involves the complete demolition and replacement of the existing heliport and structural remediation of the ambulance bay, emergency entrance, and loading dock. This market research effort is being conducted to identify qualified businesses capable of performing these functions, with responses due by December 22, 2025.
AvailableWork to consist of non-capital concrete construction, renovation, and repair; to include concrete stairs, curbing, sidewalks, walkways, ramps, and other miscellaneous concrete structures.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work to consist of non-capital concrete construction, renovation, and repair; to include concrete stairs, curbing, sidewalks, walkways, ramps, and other miscellaneous concrete structures.
AvailableWork consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
Close: Dec 18, 2025
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis