Summary
This project consists of the following in the treatment plants cell no. 2: segment 1: earthen levee rehabilitation (approx. 1,525 LF) of existing levee to an elevation of +8.0 navd88 and installation of rip rap on the interior side slope, with the intent to reduce future erosion on the levee. Segment 2: rehabilitation of the levee crown/access road (approx. 1,750 LF) with 610 limestone on the access road to an elevation of +8.5 navd88 and concrete mat installation along the interior levee side slopes, with the intent to reduce future erosion on the levee. Segment 3: rehabilitation of the levee crown/access road (approx. 1,270 LF) with 610 limestone on the access road to an elevation of +8.0 navd88 and installation of rip rap on the interior side slope, with the intent to reduce future erosion on the levee. Segment 4: earthen levee rehabilitation (approx. 1,300 LF) of existing levee to an elevation of +8.0 navd88 and installation of rip rap on the interior side slope, with the intent to reduce future erosion on the levee.