Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project scope includes renovations to the student union building/center for student leadership facility on the main campus of state college. The scope of the project is to renovate the south dining hall to include an operable partition wall opening onto the south patio. This shall include removal of an existing aluminum storefront system, installation of a new load-bearing beam, and installation of a new operable partition system (nanawall).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water Tank Access Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Water Tank Access Improvements.
AvailablePremium
Access the largest public sector contact database
Construction of approximately 600 LF of 10 by 6"of a concrete access road including minor drainage work and repairs to the existing concrete driveway. Work includes the improvement of the access road leading to an existing water tank.
Posted Date
Nov 5, 2025
Due Date
Dec 16, 2025
Release: Nov 5, 2025
Close: Dec 16, 2025
Construction of approximately 600 LF of 10 by 6"of a concrete access road including minor drainage work and repairs to the existing concrete driveway. Work includes the improvement of the access road leading to an existing water tank.
AvailableWork includes to drain the storage tank into the drainage ditch, clean the biological growth, graffiti, oil, and dirt off of the exterior walls and dome of the tank, replace and calibrate the liquid level indicator board and mechanism, add a step below the exterior ladder to shorten the distance from the ground to the first step, step can be reinforced concrete step, install an aluminum gate at the top of the exterior ladder that will be self-closing, clean and recoat the exterior access hatch and the domed fiberglass vent covers on the top of the tank, replace corroded hardware on the lightening protection equipment for the scada antennae on the dome of the tank.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Close: Dec 18, 2025
Work includes to drain the storage tank into the drainage ditch, clean the biological growth, graffiti, oil, and dirt off of the exterior walls and dome of the tank, replace and calibrate the liquid level indicator board and mechanism, add a step below the exterior ladder to shorten the distance from the ground to the first step, step can be reinforced concrete step, install an aluminum gate at the top of the exterior ladder that will be self-closing, clean and recoat the exterior access hatch and the domed fiberglass vent covers on the top of the tank, replace corroded hardware on the lightening protection equipment for the scada antennae on the dome of the tank.
AvailableWet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.