Summary
Consists of the following: Lot E, design and construction of an asphalt surface parking lot consisting of 949 spaces; Lot G, design and construction of an asphalt surface parking lot consisting of 673 spaces; Lot F, design and construction of an asphalt surface parking lot consisting of 767 spaces and one bus shelter; and Lot H, design and construction of an asphalt surface parking lot consisting of 336 spaces. Construction of the new parking lots contains new drainage, grading, pavement, pavement markings, electrical, lighting, signage, sod and bus shelters. The contract time for completion is approx. 2 years.