Retrieving RFP details
Release
Close
National Cemetery Admin (36C786)
Service requirements include: turf and grasses maintenance, irrigation system services, pond services, drainage system maintenance, trash & debris removal.
Securities And Exchange Commission
The SEC proposes to negotiate the procurement of expert or third-party neutral services for any current or anticipated litigation or dispute. The SEC requires these services from various contractors in support of the SEC mission. Historically, the SEC awards approximately 100 expert or third-party neutral services actions on an annual basis. This Class J&A will cover contracts awarded for expert or third-party neutral services in the SEC until rescinded. See attached file.
252-Network Contract Office 12 (36C252)
Provide Telemetry Monitors MX40 (Brand Name Only). COMFORTSLING PLUS HIGH, NET POLYESTER MEDIUM Philips 865350-VA 28 EA S02 ECG + Fast SpO2 Enabled M02 Impedance Respiration C01 Enhanced Arrhythmia C03 Vitals Trend BAT - Pwr Mdl, MX40 Li-ion Bat, 3 pack Philips 989803205811 10 EA CBL ECG 5lead Grabber, AAMI + SpO2, Tele Philips 989803171851-15 28 EA Reusable Adult SpO2 Sensor Philips 989803144371 28 EA Clin Config & Imp: 1 Standard Shift Philips 989803216591 2 EA.
NASA AMES Research Center
Developing competitive proposals in response to NASA Announcements of Opportunity (AOs), Broad Agency Announcements (BAAs), Missions of Opportunity (MoOs) and proposal calls from other government agencies. ARC is interested in identifying potential partners that can perform science investigations, conduct research activities, and develop and demonstrate new technologies that are aligned with NASA’s goals. Information is also sought regarding partners that, in addition to performing substantial research, can provide flight hardware (i.e., spacecraft, deployment systems, suborbital systems, ground support systems, equipment, or instrumentation) necessary to implement proposed science investigations, research activities or technology demonstration missions.
U.S. Army Engineer District Philadelphia
Maintenance dredging of the river. Depth of 17 ft MLLW plus 2 ft overdepth, non-contour dredging, with the exception of the turning basin which will be 16 ft MLLW plus 1 ft overdepth. See attached file.
Release
Jan 13, 2025
Close
Jan 23, 2025