Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contractor shall remove existing doors. Installation of new doors, hardware as well as set up, tear down, and clean up. One or Two technicians for one full day
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnishing the sky mountain substation masonry fence and control building.
Posted Date
Nov 9, 2025
Due Date
Dec 23, 2025
Release: Nov 9, 2025
Close: Dec 23, 2025
Furnishing the sky mountain substation masonry fence and control building.
AvailablePremium
Access the largest public sector contact database
Provide facility maintenance contract. Work includes preventative and corrective maintenance, scheduled sustainment, emergency repairs, inspections, testing, and certifications, operation and maintenance of all systems, regulatory compliance, reporting and documentation, and all necessary installation, modification, and upgrades.
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
Close: Dec 15, 2025
Provide facility maintenance contract. Work includes preventative and corrective maintenance, scheduled sustainment, emergency repairs, inspections, testing, and certifications, operation and maintenance of all systems, regulatory compliance, reporting and documentation, and all necessary installation, modification, and upgrades.
AvailableThe Mission and Installation Contracting Command (MICC) at Fort Buchanan, Puerto Rico is conducting market research to identify 8(a) small businesses capable of providing grounds/ground maintenance services at Fort Buchanan installations. This Sources Sought is informational only (not a solicitation) and requests capabilities statements, CAGE/UEI, socio-economic status, and tailored capability statements; a draft Performance Work Statement (PWS) is referenced. Responses are voluntary and must be emailed to the contracting points of contact.
Posted Date
Dec 10, 2025
Due Date
Dec 22, 2025
Release: Dec 10, 2025
Close: Dec 22, 2025
The Mission and Installation Contracting Command (MICC) at Fort Buchanan, Puerto Rico is conducting market research to identify 8(a) small businesses capable of providing grounds/ground maintenance services at Fort Buchanan installations. This Sources Sought is informational only (not a solicitation) and requests capabilities statements, CAGE/UEI, socio-economic status, and tailored capability statements; a draft Performance Work Statement (PWS) is referenced. Responses are voluntary and must be emailed to the contracting points of contact.
AvailablePerform the Architect-Engineer (A-E) services required for a firm-fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for Facility Planning Services. Support services may include architectural, civil engineering, seismic (including but not limited to Tier 1 and Tier 2 Seismic Evaluation) landscape, architectural, mechanical, electrical, telecommunications, fire protection, traffic and circulation, topographical, hydrological, geotechnical / subsurface, anti-terrorism / force protection, controlled/secured spaces, cybersecurity, utility, renewable energy, and hazardous materials studies.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
Perform the Architect-Engineer (A-E) services required for a firm-fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for Facility Planning Services. Support services may include architectural, civil engineering, seismic (including but not limited to Tier 1 and Tier 2 Seismic Evaluation) landscape, architectural, mechanical, electrical, telecommunications, fire protection, traffic and circulation, topographical, hydrological, geotechnical / subsurface, anti-terrorism / force protection, controlled/secured spaces, cybersecurity, utility, renewable energy, and hazardous materials studies.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis