Summary
This solicitation seeks design and construction of a microgrid and combined heat and power (CHP) system at the Lake City Army Ammunition Plant under the Energy Resilience and Conservation Investment Program (ERCIP). The project involves a 15 MW dual-fuel CHP system with two 7.5 MW combustion turbines, heat recovery steam generators, a microgrid control system capable of islanding and utility-parallel operations, and propane storage infrastructure, with an estimated construction magnitude between $25 million and $100 million. The solicitation is Full and Open with a HUBZone price evaluation preference, and access to the restricted technical package containing Controlled Unclassified Information requires an active SAM registration and CMMC Level 2 compliance.