Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of hauling services for sand, topsoil, and ABC rock to the County's landfill.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
New Hanover County Recycling & Solid Waste is soliciting bids for soil and rock hauling services under RFB 26-0195. Sealed bids must be submitted to Courtney Prince, Purchasing Agent, by 3:00 P.M. EST on January 20, 2026. Further instructions and complete requirements are available on the County's website.
Posted Date
Jan 6, 2026
Due Date
Jan 20, 2026
Release: Jan 6, 2026
Close: Jan 20, 2026
New Hanover County Recycling & Solid Waste is soliciting bids for soil and rock hauling services under RFB 26-0195. Sealed bids must be submitted to Courtney Prince, Purchasing Agent, by 3:00 P.M. EST on January 20, 2026. Further instructions and complete requirements are available on the County's website.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed work consists of restoration and enhancement using natural channel design techniques of approx. 14,891 LF of stream channels. Tasks to be performed to achieve project goals include reshaping of existing channels; re-establishment of new channels with stable dimensions; construction of in-stream structures; preparation of soil for seeding; native planting and seeding; installation of erosion control fabric and mulch; and harvesting, transporting, installing, and maintaining live stake and vegetative materials. The related stream channels have both ephemeral and intermittent flow regimes. The restoration project will re-establish approximately 1,553 LF of channel, rehabilitate 5,473 LF, enhance 2,400 LF, and provide riparian habitat enhancement along approx. 5,465 LF. Restoration will include in-stream structures such as brush toe, rock riffles, brush riffles, brush runs, woody debris drops, and headwater channel, as well as vegetation of the stream banks and improvement to the forested riparian corridor along the streams. In addition to the restoration, the project includes 143 feet of preservation.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Close: Jan 29, 2026
The proposed work consists of restoration and enhancement using natural channel design techniques of approx. 14,891 LF of stream channels. Tasks to be performed to achieve project goals include reshaping of existing channels; re-establishment of new channels with stable dimensions; construction of in-stream structures; preparation of soil for seeding; native planting and seeding; installation of erosion control fabric and mulch; and harvesting, transporting, installing, and maintaining live stake and vegetative materials. The related stream channels have both ephemeral and intermittent flow regimes. The restoration project will re-establish approximately 1,553 LF of channel, rehabilitate 5,473 LF, enhance 2,400 LF, and provide riparian habitat enhancement along approx. 5,465 LF. Restoration will include in-stream structures such as brush toe, rock riffles, brush riffles, brush runs, woody debris drops, and headwater channel, as well as vegetation of the stream banks and improvement to the forested riparian corridor along the streams. In addition to the restoration, the project includes 143 feet of preservation.
AvailableThe project will consist of providing drilling and blasting services to facilitate the excavation of soil and rock material for the construction of a new sediment pond.
Posted Date
Dec 14, 2025
Due Date
Jan 14, 2026
Release: Dec 14, 2025
Close: Jan 14, 2026
The project will consist of providing drilling and blasting services to facilitate the excavation of soil and rock material for the construction of a new sediment pond.
AvailableGrading, drainage, structures, paving & roadside development includes 1,330 SY compost erosion blanket, 2,100 foot sediment fence, 2,792 ton contaminated soil disposal, 4,670 CY general excavation, 544 LF mainline video with laser profile inspection, 521 LF 18" storm sewer pipe 5 FT depth, 1 EA concrete manholes, 611 LF furnish PP 16X0.5 steel piles, 488 foot deck BT 47 precast prestressed girders, 1,674 SF furnish sheet pile.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Grading, drainage, structures, paving & roadside development includes 1,330 SY compost erosion blanket, 2,100 foot sediment fence, 2,792 ton contaminated soil disposal, 4,670 CY general excavation, 544 LF mainline video with laser profile inspection, 521 LF 18" storm sewer pipe 5 FT depth, 1 EA concrete manholes, 611 LF furnish PP 16X0.5 steel piles, 488 foot deck BT 47 precast prestressed girders, 1,674 SF furnish sheet pile.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →