Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project will replace the condensate unit and vacuum pump stations in the adjacent area. No significant architectural or electrical work is anticipated.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes installing approximately 300 feet of a new bored-in steam condensate line between existing steam vaults, installing approximately 80 feet of direct-bury steam condensate pipe, performing condensate pipe welding, building and vault core drills and patching, removing and replacing sidewalks, and excavation and backfill.
Posted Date
Jan 20, 2026
Due Date
Feb 10, 2026
Release: Jan 20, 2026
Close: Feb 10, 2026
Work includes installing approximately 300 feet of a new bored-in steam condensate line between existing steam vaults, installing approximately 80 feet of direct-bury steam condensate pipe, performing condensate pipe welding, building and vault core drills and patching, removing and replacing sidewalks, and excavation and backfill.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include remove and dispose of the existing condensate tank, pumps, and associated piping. Disconnect existing condensate tank electric-panel. Install new condensate tank panel. Install a new 3-inch pad for the new condensate tank. Furnish, rig, transport, and set the new condensate tank and pump unit on new pad. Modify and reconnect pump discharge piping to the existing discharge header. Furnish and extend a new vent/overflow line a minimum of 20feet to the approved termination point with proper pitch and supports.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Work include remove and dispose of the existing condensate tank, pumps, and associated piping. Disconnect existing condensate tank electric-panel. Install new condensate tank panel. Install a new 3-inch pad for the new condensate tank. Furnish, rig, transport, and set the new condensate tank and pump unit on new pad. Modify and reconnect pump discharge piping to the existing discharge header. Furnish and extend a new vent/overflow line a minimum of 20feet to the approved termination point with proper pitch and supports.
AvailableLinac Replacement.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Linac Replacement.
AvailableProvide an air handling unit replacement.
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Close: Feb 19, 2026
Provide an air handling unit replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →