Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Snohomish School District 201
Demolish existing concrete slide access tower and associated footing and construct new fiberglass (FRP hybrid) access tower with associated footing. Provide structural engineering along with deferred plan review submittal drawings. Existing fiberglass slide is to remain and be reattached to the new tower. Connect existing water line to slide assembly. Install emergency shutoff button located at the top of the tower. Demolish damaged curtain wall structural connections near the existing slide tower and replace with new ones.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Douglass Hills
Replacement of the water slide at its public pool.
Posted Date
Nov 12, 2025
Due Date
Nov 24, 2025
Release: Nov 12, 2025
City of Douglass Hills
Close: Nov 24, 2025
Replacement of the water slide at its public pool.
AvailableCity of Cortez
Installation and removal of temporary shoring to support structural elements vertically. Specifically, the contractor must furnish and install discrete galvanic anodes embedded in concrete repair or surface mounted galvanic anodes on concrete surfaces; perform batching and placement procedures for packaged concrete repair materials, concrete formwork, and finishing of concrete; establish corrosion-inhibiting coating to existing reinforcing bars and embedded steel material and perform the fabrication and installation of new epoxy-coated reinforcement as required; ensure adequate curing and protection of all concrete repairs; and the contractor must provide and properly apply traffic coating, silane water repellant, and install sealant in concrete joints.
Posted Date
Oct 29, 2025
Due Date
Dec 18, 2025
Release: Oct 29, 2025
City of Cortez
Close: Dec 18, 2025
Installation and removal of temporary shoring to support structural elements vertically. Specifically, the contractor must furnish and install discrete galvanic anodes embedded in concrete repair or surface mounted galvanic anodes on concrete surfaces; perform batching and placement procedures for packaged concrete repair materials, concrete formwork, and finishing of concrete; establish corrosion-inhibiting coating to existing reinforcing bars and embedded steel material and perform the fabrication and installation of new epoxy-coated reinforcement as required; ensure adequate curing and protection of all concrete repairs; and the contractor must provide and properly apply traffic coating, silane water repellant, and install sealant in concrete joints.
AvailableMonroe County
Pool liner replacement.
Posted Date
Nov 15, 2025
Due Date
Dec 18, 2025
Release: Nov 15, 2025
Monroe County
Close: Dec 18, 2025
Pool liner replacement.
AvailableAlabama Department of Veterans Affairs
Work includes the removal and replacement of adva's existing cooling tower.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Alabama Department of Veterans Affairs
Close: Dec 18, 2025
Work includes the removal and replacement of adva's existing cooling tower.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis