Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolish existing concrete slide access tower and associated footing and construct new fiberglass (FRP hybrid) access tower with associated footing. Provide structural engineering along with deferred plan review submittal drawings. Existing fiberglass slide is to remain and be reattached to the new tower. Connect existing water line to slide assembly. Install emergency shutoff button located at the top of the tower. Demolish damaged curtain wall structural connections near the existing slide tower and replace with new ones.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU).
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU).
AvailableThe solicitation seeks a contractor to replace an undersized culvert on E.F. Tower Creek Road with an open-bottom custom arch structure to improve aquatic organism passage. The work includes temporary road access, approximately 5,000 cubic yards of excavation, installation of a 20-foot span by 16-foot rise arch pipe with engineered precast footings, gabion wingwalls, and backfill on a county gravel road. The project is located near Salmon in Lemhi County, Idaho and follows an in-stream work window typical for fish-passage projects.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
The solicitation seeks a contractor to replace an undersized culvert on E.F. Tower Creek Road with an open-bottom custom arch structure to improve aquatic organism passage. The work includes temporary road access, approximately 5,000 cubic yards of excavation, installation of a 20-foot span by 16-foot rise arch pipe with engineered precast footings, gabion wingwalls, and backfill on a county gravel road. The project is located near Salmon in Lemhi County, Idaho and follows an in-stream work window typical for fish-passage projects.
Replacement of a cooling tower.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Replacement of a cooling tower.
AvailableThe City of Manchester requests sealed bids to remove and replace the baby pool slide feature at Schroeder Park Aquatic Center (with add alternates for rocking frogs, spraying seahorse, and spraying rainbow features). Preference for slide work not to exceed $165,000 and completion by May 1, 2026. Bidders must have ≥5 years municipal pool/waterpark experience, provide performance/payment bonds and specified insurance limits, comply with prevailing wage and federal work-authorization requirements, and the City will award a single exclusive contractor (no subcontractors).
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
The City of Manchester requests sealed bids to remove and replace the baby pool slide feature at Schroeder Park Aquatic Center (with add alternates for rocking frogs, spraying seahorse, and spraying rainbow features). Preference for slide work not to exceed $165,000 and completion by May 1, 2026. Bidders must have ≥5 years municipal pool/waterpark experience, provide performance/payment bonds and specified insurance limits, comply with prevailing wage and federal work-authorization requirements, and the City will award a single exclusive contractor (no subcontractors).
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →