Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
he City of Aspen is seeking a qualified engineering consultant to provide full design services for the rehabilitation of the Smuggler Bridge, a 52-year-old structure carrying Power Plant Road over Castle Creek. The project will address ongoing scour at the abutments, deterioration of the deck, bearings, substructure concrete, and localized steel corrosion, while making targeted safety and operational improvements to extend the service life of the bridge
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN-BUILD services for Bridge Group 16D Route 6 Johnston. The proposals would include completely replacing three (3) bridges (Bridge Nos. 060701, 060801, and 060901) along the US Route 6 corridor; realigning the US Route 6 westbound off-ramp to US Route 6A westbound to improve intersection geometry and safety.
Posted Date
Nov 26, 2025
Due Date
Mar 9, 2026
Release: Nov 26, 2025
Close: Mar 9, 2026
DESIGN-BUILD services for Bridge Group 16D Route 6 Johnston. The proposals would include completely replacing three (3) bridges (Bridge Nos. 060701, 060801, and 060901) along the US Route 6 corridor; realigning the US Route 6 westbound off-ramp to US Route 6A westbound to improve intersection geometry and safety.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-Build: Rehabilitating Parking deck. Demolition of existing levels 8 and 9 is currently built as offices and rebuilding them into parking levels. Maintain 10,000 SF of retail space on street level (level 3) and convert the rest into parking spaces. Partial demolition of one bay of level 4 office space to allow for double height retail on level 3 below. Full replacement of major systems including but not limited to mechanical, electrical, plumbing, elevators, sprinklers, etc., as well as addition of EV chargers (if necessary). Interior renovation of the retail space. Minor repair, fresh paint, and hardware replacement throughout the parking deck. As-built plans may be required to complete the design for this rehabilitation project.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Design-Build: Rehabilitating Parking deck. Demolition of existing levels 8 and 9 is currently built as offices and rebuilding them into parking levels. Maintain 10,000 SF of retail space on street level (level 3) and convert the rest into parking spaces. Partial demolition of one bay of level 4 office space to allow for double height retail on level 3 below. Full replacement of major systems including but not limited to mechanical, electrical, plumbing, elevators, sprinklers, etc., as well as addition of EV chargers (if necessary). Interior renovation of the retail space. Minor repair, fresh paint, and hardware replacement throughout the parking deck. As-built plans may be required to complete the design for this rehabilitation project.
AvailableHousing Major Rehab..
Posted Date
Nov 20, 2025
Due Date
Jan 9, 2026
Release: Nov 20, 2025
Close: Jan 9, 2026
Housing Major Rehab..
AvailableDESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 15, 2026
Release: Dec 2, 2024
Close: Jan 15, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →