Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement project for the Smith wastewater treatment plant and head works.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of the replacement of the existing extending aeration plant with a new 8,000 gpd package steel plant. Required yard piping, wiring and conduit to make a complete and operable system is included.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
Project consists of the replacement of the existing extending aeration plant with a new 8,000 gpd package steel plant. Required yard piping, wiring and conduit to make a complete and operable system is included.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableProcurement and installation of a new UV Disinfection System, preferably TrojanUVSigna™ 3000 or equivalent, at the Harold G. Thompson Wastewater Treatment Plant.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Procurement and installation of a new UV Disinfection System, preferably TrojanUVSigna™ 3000 or equivalent, at the Harold G. Thompson Wastewater Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →