Summary
Work includes 1,051 TON hot mix asphaltic concrete, 2" of fc-12.5 asphaltic concrete (traffic level c) with pg 76-22 polymer binder and butt milling road and bridge construction; tack coat, cleaning & edging of pavement, and asphalt testing; 9,100 SY milling, 1. 5" depth; 35 LF thermoplastic, std, white, solid, 24"; 1. 3 gm thermoplastic, std-op, white, solid, 6"; 120 LF thermoplastic, std-op, white, solid, 12"; 2 EA thermoplastic, standard, white, arrow; 11,288 SY performance turf - bahia, sod(shoulder grading/embankment/borrow work is incidental to the contract); 1 EA gopher tortoise removal/relocation. See attached file.