Summary
Provide pile dike repairs. The overall scope of this requirement is to perform updated surveys to finalize the Plans and Specifications (P&S) package for the Skamokawa pile dike system repairs and update the Design Documentation Report (DDR) accordingly. Finalizing this package will enable the advertisement, contractor selection, and execution of a construction contract. In addition, to the updated surveys includes updating the existing DDR to reflect any design modifications made during the finalization of the P&S package. Optional work includes a hydraulic modeling update, topographic and bathymetric surveys, an additional round of BCOES review, and a project team meeting. See attached file.