Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Pembroke Pines Recreation & Cultural Arts Department intends to negotiate a sole-source contract for precision sidewalk trip hazard evaluation and ADA-compliant concrete grinding services for city parks and recreational facilities, using a proprietary/patented method. The notice requests written responses only to contest the sole-source determination and states responses will not be treated as proposals, bids, or quotes; submissions must be made electronically via the City’s OpenGov portal. The action is a procurement (not a grant), and the deadline for responses is Jan 7, 2026 at 2:00 PM Eastern.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This is a Notice to Sole Source for precision sidewalk trip hazard evaluation and ADA‑compliant concrete grinding services for City park and recreational facilities in Pembroke Pines, Florida. The City cites proprietary, patented methods and specialized documentation/reporting capabilities as justification for a sole‑source approach. Interested parties may submit evidence disputing the sole‑source determination by the submission deadline.
Posted Date
Dec 24, 2025
Due Date
Jan 7, 2026
Release: Dec 24, 2025
Close: Jan 7, 2026
This is a Notice to Sole Source for precision sidewalk trip hazard evaluation and ADA‑compliant concrete grinding services for City park and recreational facilities in Pembroke Pines, Florida. The City cites proprietary, patented methods and specialized documentation/reporting capabilities as justification for a sole‑source approach. Interested parties may submit evidence disputing the sole‑source determination by the submission deadline.
AvailableReconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Diamond grinding concrete pavement.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
Diamond grinding concrete pavement.
AvailableProvide ADA compliant ramp installation services. 1 LS clear & grub site, 1 LS mobilization, 516 SY demolition and removal of existing concrete area for 6" thick concrete sidewalk, 973 SY 6" concrete sidewalk, 42 LF HDPE drainage pipe, 31 SY asphalt regrading for trench drain installation, 357 LF 18" white solid thermoplastic pavement marking, 421 SY sodding, 25 EA sign panel.
Posted Date
Nov 20, 2025
Due Date
Jan 5, 2026
Release: Nov 20, 2025
Close: Jan 5, 2026
Provide ADA compliant ramp installation services. 1 LS clear & grub site, 1 LS mobilization, 516 SY demolition and removal of existing concrete area for 6" thick concrete sidewalk, 973 SY 6" concrete sidewalk, 42 LF HDPE drainage pipe, 31 SY asphalt regrading for trench drain installation, 357 LF 18" white solid thermoplastic pavement marking, 421 SY sodding, 25 EA sign panel.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis