Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes sidewalk revision.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide sidewalk repairs. The sidewalk repair sections will be twenty feet or less in length. Each sidewalk repair area is marked with white paint. The scope of work for the sidewalk repairs shall be to saw cut the area, remove existing sidewalk, set forms, rebar, dowels, expansion joints as needed, place and finish new concrete sidewalk. Rebar shall be #3 bars on 16" centers, both ways. Concrete shall be a minimum of 5 sack cement per yard, limestone gravel, 3,000 psi ready mix concrete. Expansion joints shall be redwood or treated wood for ground contact.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Provide sidewalk repairs. The sidewalk repair sections will be twenty feet or less in length. Each sidewalk repair area is marked with white paint. The scope of work for the sidewalk repairs shall be to saw cut the area, remove existing sidewalk, set forms, rebar, dowels, expansion joints as needed, place and finish new concrete sidewalk. Rebar shall be #3 bars on 16" centers, both ways. Concrete shall be a minimum of 5 sack cement per yard, limestone gravel, 3,000 psi ready mix concrete. Expansion joints shall be redwood or treated wood for ground contact.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sidewalk project.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Sidewalk project.
AvailableSidewalk Project.
Posted Date
Jan 6, 2026
Due Date
Feb 26, 2026
Release: Jan 6, 2026
Close: Feb 26, 2026
Sidewalk Project.
AvailableThe work generally includes, but is not limited to, providing all supervision, labor, material and equipment required to complete the removal of existing concrete sidewalk, installation of a structurally designed concrete sidewalk, installation of block retaining wall, installation of storm sewers, and repaving. Also includes 30 SY of Moment Slab Sidewalk and Curb with Toe Wall 4 Feet Below Sidewalk, Sta. 2+76 - 3+28 (Sidewalk Detail No. 1); 85 SY of Concrete Sidewalk with Integral Curb and Toe Wall 1 Foot Below Sidewalk. Sta. 3+68 - 5+28 (Sidewalk Detail No. 2). See outside link.
Posted Date
-
Due Date
Jan 23, 2026
Release: -
Close: Jan 23, 2026
The work generally includes, but is not limited to, providing all supervision, labor, material and equipment required to complete the removal of existing concrete sidewalk, installation of a structurally designed concrete sidewalk, installation of block retaining wall, installation of storm sewers, and repaving. Also includes 30 SY of Moment Slab Sidewalk and Curb with Toe Wall 4 Feet Below Sidewalk, Sta. 2+76 - 3+28 (Sidewalk Detail No. 1); 85 SY of Concrete Sidewalk with Integral Curb and Toe Wall 1 Foot Below Sidewalk. Sta. 3+68 - 5+28 (Sidewalk Detail No. 2). See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →