Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx 400 LF Install silt fence; 400 LF maintain silt fence; 400 LF remove silt fence; 1,300 LF install wattle; 129 CY excavation, on-site; 6,073 CY install seeding, city of Omaha type A; 6,073 CY install rolled erosion control, type I; traffic control; etc.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of approx. 5.4 miles of Rail Trail; Installation of approx. 1,465 LF of culvert pipe ranging 15" through 36"; Shaping/cleaning of ditches and shoulders for 5.4 miles of Rail Trail; Improvements to four (4) existing rail bridges; Installation of aggregate ballast repair in select areas; Installation of separation fabric, aggregate base course, and aggregate top course for surfacing of the 5.4 miles of Rail Trail; Installation of controlled access gates, signage, bollards, and trail appurtenances; Clearing/grubbing; Excavation/earthwork associated with slip repairs; Restoration Work – Seeding, mulching, disposal of trash/debris.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Construction of approx. 5.4 miles of Rail Trail; Installation of approx. 1,465 LF of culvert pipe ranging 15" through 36"; Shaping/cleaning of ditches and shoulders for 5.4 miles of Rail Trail; Improvements to four (4) existing rail bridges; Installation of aggregate ballast repair in select areas; Installation of separation fabric, aggregate base course, and aggregate top course for surfacing of the 5.4 miles of Rail Trail; Installation of controlled access gates, signage, bollards, and trail appurtenances; Clearing/grubbing; Excavation/earthwork associated with slip repairs; Restoration Work – Seeding, mulching, disposal of trash/debris.
Premium
Access the largest public sector contact database
Work consist of 20,310 SF of remove existing and construct new 4" thick pcc sidewalk, 3,724 SF of remove existing colored stamped 4" thick pcc sidewalk, 281 sf of construct new stamped adobe tan colored 4" thick pcc sidewalk, 4 EA of remove existing and construct new pcc curb ramp, 334 SF of remove existing and construct new pcc driveway, 312 LF of remove existing and construct new concrete curb and gutter, 1 EA of remove tree and dispose of existing roots, 20 CY of import subgrade to fill in voids under sidewalk, 21 EA of replace water meter pull boxes and adjust cover to new grade.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Work consist of 20,310 SF of remove existing and construct new 4" thick pcc sidewalk, 3,724 SF of remove existing colored stamped 4" thick pcc sidewalk, 281 sf of construct new stamped adobe tan colored 4" thick pcc sidewalk, 4 EA of remove existing and construct new pcc curb ramp, 334 SF of remove existing and construct new pcc driveway, 312 LF of remove existing and construct new concrete curb and gutter, 1 EA of remove tree and dispose of existing roots, 20 CY of import subgrade to fill in voids under sidewalk, 21 EA of replace water meter pull boxes and adjust cover to new grade.
AvailableWork includes 1,35 square yards demolition of existing concrete, 8 each inlet protection systems, 8 each mailbox relocations, lump sum tree/shrub removal, 14 each manhole/cleanout. Adjust valve boxes, rims, lids, 1,120 linear feet concrete curb and gutter, 2650 square yards of 4concrete sidewalk, 900 square yards of 6 sidewalks and driveways, 300 square feet of detectable warning surfaces, 2000 square yards of performance turf sod along the edge of the sidewalk, 6 each sign, posts relocate, 1950 linear feet of thermo, std, white, 12 striping for crosswalks, 40 linear feet of thermo, std, white, solid, 24 striping for stop bars, and other associated miscellaneous items.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
Work includes 1,35 square yards demolition of existing concrete, 8 each inlet protection systems, 8 each mailbox relocations, lump sum tree/shrub removal, 14 each manhole/cleanout. Adjust valve boxes, rims, lids, 1,120 linear feet concrete curb and gutter, 2650 square yards of 4concrete sidewalk, 900 square yards of 6 sidewalks and driveways, 300 square feet of detectable warning surfaces, 2000 square yards of performance turf sod along the edge of the sidewalk, 6 each sign, posts relocate, 1950 linear feet of thermo, std, white, 12 striping for crosswalks, 40 linear feet of thermo, std, white, solid, 24 striping for stop bars, and other associated miscellaneous items.
AvailableWork includes construction of ADA compliant sidewalk, ramps, & street improvements.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work includes construction of ADA compliant sidewalk, ramps, & street improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis